BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 22, 2025 at 8:00 PM

Updated August 23, 2025

Site work and paving for a mixed-use development in Victorville, California. Completed plans call for site work for a pipeline; sidewalk / parking lot; for paving for a sidewalk / parking lot; and transportation facility.

**As of August 22nd, 2025, the project was awarded to A.M. Ortega Construction, Inc, with an awarded amount of $181,052.42.** VMUS Gas Improvement Project - Phase 5. Question Deadline 07/08/2025 at 12:00 PM PT All questions, other than those asked at the pre-bid meeting and not specifically addressed within the Contract Documents, must be submitted in writing to cmcalderon@victorvilleca.gov. Bid Guaranty and Bonds: Each Bid Proposal shall be accompanied by: (a) cash; (b) a certified or cashier's check; or (c) a bidder's bond made payable to City of Victorville in an amount equal to ten percent (10%) of the Total Base Bid as bid security. Said Bid Guaranty shall be enclosed in the same envelope as the Bid Proposal and no bid shall be considered unless such Bid Guaranty is enclosed therewith. The successful Bidder will be also required to furnish performance and payment bonds, each in an amount equal to one hundred percent (100%) of the Total Base Bid. Any contract for the Project will be awarded to the lowest responsive, responsible Bidder as determined by the City using the amount of the Total Base Bid for bid comparison purposes. Such award, if made, shall be made within ninety (90) calendar days after opening of the bids. The City reserves the right to reject any or all bids or to waive any irregularities or informalities in any bids or in the bidding process. The Design Engineer has calculated an estimate of probable construction costs for this project. The City does not wish to publicize the engineer's estimate of the project cost since this information may tend to influence the number and nature of bids received. However, for the bidder's convenience, the City will publicize that the engineer's estimate for the base bid falls within a range of $175,000.00 to $200,000.00 Pre bid meeting notes: Prospective Bidders may visit the Project Site without making arrangements through the City. In no event shall failure to inspect the site constitute grounds for a claim after contract award. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The City of Victorville is soliciting proposals from local Contractors to perform natural gas improvement project within Southern California Logistics Airport. The project scope of work includes but is not limited to: o Installation of approximately 1,020 feet of 2" PE natural gas main o Installation of approximately 85 feet of 3" poly sleeve around 2" PE natural gas pipe o Various trench/pavement repairs o Boring under concrete and asphalt pavement o Approximately 20 square feet of concrete sidewalk repair o Retrofit 1 gas meter with new orifice (To be performed by VMUS)

Award

Pipeline

$181,052.00

Public - City

Paving, Site Work

6

6

2

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
559
Active Projects
249
Bidding Soon
3,203
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2025

August 14, 2025

Project location map

18374 Phantom W, Victorville, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.