Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published June 11, 2025 at 8:00 PM
Updated June 21, 2025
Site work and new construction of a military facility in Milton, Florida. Completed plans call for the construction of a military facility.
CCI Energy and Construction Services, LLC is requesting your proposal for this project. Project Description: This is a Request for Proposal (RFP) to provide services for design and construction (Design-Build) of a new fall protection system for five diesel fueling stations at NAS Whiting Field – 3163A, 3163B, 3097, 3079, and 3126A. The Contractor must provide complete design and specification, demolition, renovation, calculations, and construction as described throughout this RFP. The work includes providing all labor, materials, management, supervision, expertise, and equipment necessary to complete the work defined by the RFP. All work must comply with applicable Local, State, and Federal Laws and Regulations, industry and construction codes and standards, manufacturer’s specifications and recommendations and all contract special provisions, terms, and conditions. The Contractor must visit the project site, collect required data about existing structures, surroundings, appurtenances, and items that will be affected by this project or related to this project, and verify existing conditions. The Contractor shall be responsible for the verification of actual site conditions to ensure adequacy of the design and successful construction. The fall protection system must provide fall protection for the inspectors tasked with inspection on top of the diesel fueling trucks. The system must allow the worker to walk the length of the truck without having to un-attach/re-attach. The scope of work is separated into multiple contracts for each canopy and is described please review specifications Page 29 for full details: But not limited to please review the specifications for more information. Prevailing Wages Apply. Contract duration = 90 calendar days for design and 180 calendar days for construction Subcontractor proposals are due to CCI by NOON, Friday, June 06, 2025. Direct all RFI's, bids, and scope letters to the following individuals/emails: 1. Dan Carruth - dcarruth@bbch-llc.com 2. Mike McCoy - mmccoy@bbch-llc.com 3. const-bids@bbch-llc.com We are requesting at the time of submitting your bid that you provide your EMR (Experience Modification Rate), Bond Rate and Bonding Capacity (single project & aggregate) for consideration. Section I EMR and Representations Warranties forms are located in the files which needs to be filled out and returned upon submission of your proposal. You are required to provide a hard copy of your bid bond at the time proposals are due.
Post-Bid
Military
$5,000,000.00
Public - Federal
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 20, 2025
July 28, 2025

To Be Determined, Milton, FL
Related To This Project
Milton, FL
--
Milton, FL
Bid Date: Jun 20 2025
Milton, FL
Bid Date: Jul 11 2025
Milton, FL
Bid Date: Jul 16 2025
Milton, FL
Bid Date: Jun 30 2025
Milton, FL
Bid Date: Jun 18 2025
Milton, FL
Bid Date: Jun 23 2025
Milton, FL
Bid Date: Jul 30 2025
Milton, FL
Bid Date: May 28 2025
Milton, FL
Bid Date: Jun 13 2025
Milton, FL
--
Milton, FL
--
Milton, FL
Bid Date: May 12 2025
Milton, FL
Bid Date: Apr 28 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.