EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 17, 2025 at 8:00 PM

Updated July 18, 2025

Demolition, site work and paving for a mixed-use development in Valparaiso, Indiana. Completed plans call for the demolition of a playground / park / athletic field; for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Scope of Work Includes, but is Not Limited to: Phase 1 Kirchhoff Park Improvements Site Clearing & Demolition Removal of the Two (2) Existing Restroom Buildings, Removal of Two (2) Wood Framed Pavilions, Including Utilities, Removal of the Existing Playground, Wood Ramp, Site Furnishings, Removal of the Existing Asphalt Pickleball and Basketball Courts, Removal of the North Parking and Driveway, East Pathway, and Selective Areas of Concrete Pavement Utilities Installation of New Sanitary and Storm Sewer Systems, Water and Electrical Services, Including Site Lighting Steel Shelter Assembly Assembly and Erection of Three (3) Prefabricated Steel Shelters Purchased and Provided by the Valparaiso Parks & Recreation Department, Including Concrete Footings and Electrical Service. Concrete Foundation for Pre fabriacted Restroom Construction of Two (2) Concrete Foundations to Support the Installation of Two (2) 24-6 X 12-6 Prefabricated Restroom. Prefabricated Restrooms to Be Installed by Owner. oncrete Pavement Construction of Approximately 41,510 Square Feet of Concrete Pavement/flatwork With Approximately 290 Linear Feet of an Integral Concrete Playground Curb/edge. Lawn Restoration Restoration of Approximately Four (4) Acres of Disturbed Lawn and Site Clearing Areas. Phase 2 Institute Street Improvements Maintenance of Traffic Traffic Maintenance Signage, Including Sidewalk and Street Closure Identification. A certified cashiers check payable to the City of Valparaiso or a bid bond in an amount equal to five (5) percent of the bid amount must accompany each bid. All checks of unsuccessful bidders shall be returned to them by the City upon selection of successful bidder. The successful Bidder will be required to provide a Performance and Payment Bond in the amount of one hundred (100) percent of the Contract amount. Question Deadline 06/19/2025 All bidding questions are due (5) days before bid opening. Bids will be presented, and if acceptable, a recommendation of award will be made at the Board of Public Works meeting within City Hall Council Chambers, 166 W. Lincolnway, Valparaiso, IN 46383 beginning at 11:00 am, local prevailing time on Friday, June 27, 2025. The City reserves the right to reject any and all bids or to waive any informalities in the bidding, should the City deem it to be in the public interest to do so. Authorized and published by the authority of the City acting by and through its Board of Public Works and Safety.

Award

Playgrounds / Parks / Athletic Fields

$2,249,000.00

Public - City

Demolition, Paving, Site Work

40

14

8

4

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Special Procedures, Alteration Project Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Demolition, Selective Structure Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Loading Dock Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Other Furnishings, Site Furnishings
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Identification for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Compaction, Earthwork Methods, Soil Stabilization, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Planting, Planting Preparation, Landscape Grading
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Electrical Utilities, Utility Substations
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders, Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Clamps
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
116
Bidding Soon
1,895
All Active Projects
710
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2025

July 24, 2025

img_map_placeholder

400 Roosevelt Rd, Valparaiso, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.