BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2025 at 8:00 PM

Updated August 9, 2025

Site work for a mixed-use development in Dillon, Colorado. Completed plans call for site work for a communication facility; and water / sewer project.

The scope of services will include assistance to the State during the process of design, construction, and warranty period. Specific tasks to be performed by the Design/Build Entity (DBE) include those generally performed by the Design-Build construction community, where the Designer is also the Contractor/Builder. This project involves constructing a new 60' self-supported radio tower and installation of a state provided concrete pre-fab communication shelter, at the Lake Hill site. The awarded vendor will have experience with projects of similar scope and value. The awarded vendor is expected to provide a state of the art product in a timely and professional manner. Frequent communication between vendor, owner, and owner's engineer is expected. The Office of Public Safety Communications (OPSC) provides critical and essential public safety two-way radio communications to over 1,000 local, state, tribal and federal public safety and governmental agencies across the state. On average the system supports 8 - 9M calls per month and is one of the largest communications systems in the United States. It is currently the largest system in Colorado providing interoperability across a vast array of independent communications systems in every county jurisdiction and region of the state. Over 120,000 Colorado first responders use the system for routine operations, emergency operations, interoperability, mutual aid, for both naturally occurring and man caused large scale events. Any construction contract awarded for $500,000 or more is subject to the requirements of prevailing wage and any public project construction in the amount of $1 million dollars or more shall be required to comply with the Apprenticeship utilization requirements of C.R.S. 24-92-115. Projects utilizing Federal funds are exempt from these requirements. Please see the Colorado Department of Transportation website for their labor compliance requirements. Anticipated General Contractor Start 8/8/25 Anticipated Construction Start/Finish 8/25 - 10/25 Question Deadline 06/16/2025 at 3:00 PM MT Date Email Answers Issued 6/18/25 @ 4:00 PM MDT.

Award

Communication

$483,611.00

Public - State/Provincial

Site Work

22

12

4

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
71
Active Projects
0
Bidding Soon
955
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 11, 2025

August 8, 2025

Project location map

700 Lake Hill Rd, Dillon, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.