Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 19, 2025 at 8:00 PM
Updated August 20, 2025
Site work for a road / highway in Winston-Salem, North Carolina. Completed plans call for site work for a road / highway.
**As of August 19, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Should three bids not be received, the bid will be re-advertised. The City reserves the right to reject any or all proposals. Contractors must be properly licensed as required by Chapter 87 of the North Carolina General Statutes - at time of bid opening - to perform the work described herein as the general/prime contractor. As a design-build project, the contractor will be chosen by qualifications-based selection, with criteria being MWBE participation plan, project experience, project approach, and qualifications of personnel assigned to the project, including any subconsultants. Current schedule: Preconstruction start August 2025 with one year for construction beginning May 2026. Neither Owner nor Engineer has any responsibility for the accuracy, completeness, or sufficiency of any Bidding Documents obtained from any source other than the Issuing Office. Obtaining these documents from any source other than the Issuing Office may result in obtaining incomplete and inaccurate information. Obtaining these documents from any source other than the Issuing Office may also result in failure to receive any addenda, corrections, or other revisions to the Bidding Documents that may be issued. The project consists of constructing a new pump station and associated lines to accommodate wastewater flow. The required lines include approximately 9000 linear feet (lf) of 12-inch gravity sewer and approximately 4000 lf of 10- inch force main. The force main will terminate at a future manhole located just east of the intersection of Wallburg Road and Sherlie Weavil Road. The pump station will be a duplex submersible type with a firm pumping capacity of 660 gallons per minute (gpm). For technical questions regarding this project, submit questions in writing only to: Jordan Toney at jordant@cityofws.org. The End of Question Period is 5:00 PM, June 6, 2025. Anyone interested in bidding must contact the Owner to obtain the RFQ for this project
Post-Bid
Roads / Highways
$2,417,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 17, 2025
February 17, 2026
101 N Main St, Winston-Salem, NC
Related To This Project
Winston-Salem, NC
Bid Date: Jun 23 2025
Winston-Salem, NC
Bid Date: Nov 12 2025
Winston-Salem, NC
Bid Date: Nov 12 2025
Winston-Salem, NC
Bid Date: May 23 2025
Winston-Salem, NC
Bid Date: May 12 2025
Winston-Salem, NC
--
Winston-Salem, NC
Bid Date: Apr 02 2024
Winston-Salem, NC
--
Winston-Salem, NC
--
Winston-Salem, NC
--
Winston-Salem, NC
Bid Date: Feb 15 2023
Winston-Salem, NC
--
Winston-Salem, NC
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
