Published June 17, 2025 at 8:00 PM

Updated June 19, 2025

Site work for a water / sewer project in Aurora, Ohio. Completed plans call for site work for a water / sewer project.

The work covered by the specifications consists of the installation of 1,050 LF of 6-inch PVC waterline (open cut), 15 LF of 6 PVC waterline with casing pipe, 230 LF of 6-inch fusible PVC waterline (HDD), replacement of existing fire hydrants, valves, service connections, and appurtenances. Also included is site restoration. The proposed waterline is to replace the aging ductile iron waterline. Each bid must be accompanied by a certified or cashier's check, an irrevocable letter of credit in the amount of ten percent (10%) of the amount bid, or digital or paper bid bond in the amount of one hundred percent (100%) of the amount bid, signed by a Surety Company authorized to transact business in the State of Ohio. Such check or bid bond shall be made payable to the City of Aurora, Ohio and will be held as a guarantee that in the event the bid is accepted, and a contract awarded to the bidder, the Contract will be duly executed and its performance properly secured. If not providing a digital bid bond, wet-ink original bid bonds, checks, or letters of credit must be delivered to the Office of the Director of Public Service, Aurora Service Department, 158 W. Pioneer Trail, Aurora, Ohio, by the bid opening date and time. For any further information, please contact Samantha McCoy at 330.995.9116 or mccoys@auroraoh.com. In the case of disruption of national communications or loss of services by online within two hours prior to the deadline for submission of bids, the city will delay the deadline for bid submissions to ensure the ability of potential bidders to submit bids. If this occurs, instructions will be communicated to potential bidders. The City reserves the right to reject any and all bids, waive any informalities or irregularities in the bids received, and accept any bid which it deems most favorable to the City. Provide the labor, materials, tools, and equipment necessary, temporary or permanent, required to construct the project and improvements in accordance with the drawings and specifications, including the work restrictions specified herein. Provide the labor, tools, equipment, and materials necessary to furnish the audiovisual recording in accordance with the drawings and specifications. Scope of Work. Provide all labor and materials necessary to furnish the following submittals as required by each individual section of the specifications. 1. Shop drawings. 2. Product data. 3. Samples/mock-ups. 4. Operation and Maintenance (O&M) manuals. 5. Personnel qualifications. 6. Source quality control documents. 7. Material field test reports. 8. Product/material certifications. 9. Special warranties. 10. Project record documents. 11. Others (as specified in the individual technical specifications). Furnish, erect, maintain, and remove lights, signs, barricades, temporary guardrails, and other traffic control devices, and furnish watchpersons and flag persons as may be necessary to maintain safe traffic conditions. Scope of Work. Provide all labor, tools, equipment, and materials necessary to furnish and maintain the soil erosion controls where shown, where shown on the Contractor's Storm Water Pollution Prevention Plan (SWP3), where directed, and as specified herein. Transport and handle materials and equipment in accordance with the manufacturer's recommendations and requirements of Contract Documents. Make all arrangements for transportation, delivery, storage, and handling of equipment and materials required for prosecution and completion of the work. Provide the labor, tools, equipment, and materials necessary to perform the leakage tests and disinfection of pipes, equipment, and tanks in accordance with the drawings and the specifications. Furnish and install cast-in-place concrete in accordance with the drawings and specifications. A. This section specifies cast-in-place concrete, including formwork, reinforcing, mix design, accessories, placement procedures, joints, embedments, finishes, curing, supports for equipment and piping, and grout toppings for tanks. B. Other specification sections may reference this section for other cast-in-place concrete items. Scope of Work. Provide the labor, tools, equipment, and materials necessary to furnish and install the nonshrink grout in accordance with the drawings and as specified herein. Scope of Work. This section includes the clearing and grubbing of the work site and the following: 1. Clearing of area. 2. Grubbing of stumps and roots. 3. Removal of all other vegetation. 4. Protection of designated trees. 5. Removing above- and belowgrade structures. 6. Disposal off-site of all material generated by the clearing and grubbing operations. A. Scope of Work. Complete the excavation, backfill, and embankment necessary to construct the work as shown and specified herein. This section includes the following where applicable: structures, underground utilities, and preparing subgrade for pavements, walks, or slabs. B. Other Work. Final grading together with placement and preparation of topsoil for lawns and planting is specified in Section 32 90 02, "Grading and Seeding." Excavation and backfill for buried piping are covered in Division 33. Directional drilling including all work necessary for the directional drilling installation of pressure pipe. Provide services in accordance with the best industry practice and these specifications. Furnish all labor, equipment, and materials necessary to accomplish the work. Provide the labor, tools, equipment, and materials necessary to furnish the Fusible C900(TM) Pipe in accordance with the plans and specifications A. Scope of Work. Provide the labor, tools, equipment, and materials necessary to install the pipe and fittings in accordance with the drawings and specifications. The work includes, but is not limited to, the following: 1. Excavation, preparation of the trench bottom and bedding. 2. Shoring and bracing. 3. Piping beginning at the outside face of structures or building foundations, unless specifically included under other sections. 4. Piping beneath structures. 5. Installation of supports, restraints, and thrust blocks. 6. Work on existing buried pipelines. 7. Installation of all joints, fittings, specials, couplings, adapters, sleeves, tie rods, jointing and gasketing materials, and all other work required to complete the piping installation. 8. Valves, gates, and specials shown or specified for the piping systems. 9. Testing and disinfection. 10. Cleaning. 11. Trench maintenance.

Bid Results

Water / Sewer

$479,133.00

Public - City

Site Work

15

9

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
146
Bidding Soon
2,190
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 17, 2025

July 17, 2025

Project location map

Multiple Locations, Aurora, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.