BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 11, 2025 at 8:00 PM

Updated April 12, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Aurora, Ohio. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

This project includes the demolition and replacement of the existing single span bridge located in Paddock River Preserve on Trails End in Aurora, OH. The replacement structure is an 80', 6' wide modular, prefabricated boardwalk system bridge on concrete abutments. Included in the scope of work is trail work needed to accommodate the pro-posed bridge span and facilitation of access to the site. Cost Opinion: $472,577.50 Each bid must be accompanied by a certified or cashier's check, an irrevocable letter of credit in the amount of ten percent (10%) of the amount bid, or digital or paper bid bond in the amount of one hundred percent (100%) of the amount bid, signed by a Surety Company authorized to transact business in the State of Ohio. Such check or bid bond shall be made payable to the City of Aurora, Ohio and will be held as a guarantee that in the event the bid is accepted, and a contract awarded to the bidder, the Contract will be duly executed and its performance properly secured. If not providing a digital bid bond, wet-ink original bid bonds, checks, or letters of credit must be delivered to the Office of the Director of Public Service, Aurora Service Department, 158 W. Pioneer Trail, Aurora, Ohio, by the bid opening date and time. For any further information, please contact Samantha McCoy at 330.995.9116 or mccoys@auroraoh.com. The City reserves the right to reject any and all bids, waive any informalities or irregularities in the bids received, and accept any bid which it deems most favorable to the City. By Order of the Council of the City of Aurora, Portage County, Ohio.

Award

Bridges / Tunnels

$397,704.00

Public - City

Demolition, New Construction, Paving, Site Work

14

3

4

7

Subscribe For Documents

37 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
254
Active Projects
121
Bidding Soon
2,072
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 24, 2025

April 23, 2025

Project location map

Trails End, Aurora, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.