Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 9, 2025 at 8:00 PM
Updated July 10, 2025
Demolition, site work, paving and new construction of a civil project in Aurora, Ohio. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; and water / sewer project.
Improvement of 0.05 Miles of Pioneer Trail in the City of Aurora by the replacement of an existing twin corrugated metal plate culvert over the Aurora Branch of the Chagrin River with a new single span, precast box structure, including minimal approach work. The structure will maintain the same horizontal and vertical alignment. Replacement of Bridge No Por-Aur-164-Piotr Over the Aurora Branch of the Chagrin River, Including Replacement of Approximately Iso Ft of Approach Pavement Along With Drainage Improvements and New Guardral. Engineers estimate of cost for this improvement is $706,729.96 The bidder must agree to commence work on a date specified in a written Notice to Proceed of the owner and to fully complete the work no later than September 15, 2025. Bidder must agree to pay as liquidated damages of $600.00 per day for each consecutive calendar day thereafter for failure to meet the specified completion time. The Dbe Goal on This Project Is 8% All bids must be submitted on the bid forms submitted in the proposal. Each proposal must be accompanied by a certified check, cashier's check or letter of credit in the sum of ten percent (10%) of the amount bid, or a Bid Guarantee in the full amount of the bid, to guarantee that if said bid is accepted, a contract will be entered into and the performance of it properly secured. The bidder to whom the contract is awarded will be required to furnish a bond in the sum of 100% of the contract price for the faithful performance of the contract. The Portage County Commissioners reserve the right to waive irregularities and to reject any or all bids.
Bid Results
Bridges / Tunnels
$641,000.00
Public - County
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2025
June 16, 2025
W Pioneer Trail, Aurora, OH
Related To This Project
Aurora, OH
Bid Date: Mar 24 2025
Aurora, OH
Bid Date: Jun 03 2025
Aurora, OH
Bid Date: May 05 2025
Aurora, OH
Bid Date: May 20 2025
Aurora, OH
Bid Date: May 22 2025
Aurora, OH
Bid Date: Jun 17 2025
Aurora, OH
Bid Date: Jul 14 2025
Aurora, OH
Bid Date: Aug 18 2025
Aurora, OH
Bid Date: Mar 21 2025
Aurora, OH
Bid Date: Feb 04 2025
Aurora, OH
Bid Date: Dec 03 2024
Aurora, OH
Bid Date: Nov 18 2024
Aurora, OH
Bid Date: Oct 29 2024
Aurora, OH
Bid Date: Mar 20 2025
Aurora, OH
Bid Date: Oct 29 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
