BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 26, 2025 at 8:00 PM

Updated August 27, 2025

Renovation of an educational facility in Temperance, Michigan. Completed plans call for the renovation of a educational facility.

Boiler Replacement for the following school: Bedford Senior High School, 8285 Jackman Rd. Temperance, MI 48182 . Provide all material, equipment, and labor to replace the following existing boilers with similar equipment . The Bedford Public School Board reserves the right to reject any and all bids. The proposal shall state the minimum time required to complete the project. Question deadline: 6/24/25 - All Requests for clarification must be directed to Tom Martin, Executive Director of Operations, tom.martin@mybedford.us work is scheduled to commence the week ofJuly 7, 2025. This Project is to be completed on or before September 1, 2025. Respondents to provide qualified labor and materials to perform demo, cut, and cap and removal of two (2) existing boilers. Includes removal and disposal of the existing hot water piping, gas piping and electrical per the project requirements. Includes equipment and scrap disposal in strict accordance with EPA guidelines. Provide and install Two (2) Patterson -Kelley boilers equal in size and model to the existing being replaced. And shall be installed in strict accordance with manufacturer's written installation instructions and code requirements. Electrical reconnect to existing circuit. Includes allowance for new boiler venting per manufacturers recommendations. Includes labeling and identifying all new equipment. Includes all necessary material handling and shipping and rigging and lifting per the project requirements. Includes complete start-up by factory qualified personnel including performance verification and warranty registration. Includes all work to be performed in a safe and workmanlike manner, per all MIOSHA rules, regulations and guidelines. Includes all work to be performed in strict accordance with local codes and governance. Provide owner's training on operation and maintenance of installed systems. To include two (2) bound copies of commissioning reports with all critical parameters recorded in spreadsheet format, all pertinent operational and maintenance manuals and documentation.

Occupancy

Educational

$120,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
453
Active Projects
269
Bidding Soon
2,623
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2025

July 7, 2025

Project location map

8285 Jackman Rd, Temperance, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.