BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 26, 2026 at 8:00 PM

Updated March 27, 2026

Renovation of a mixed-use development in Temperance, Michigan. Completed plans call for the renovation of a 93,000-square-foot educational facility; and 91,300-square-foot educational facility.

Bedford Public Schools is seeking sealed bid proposals for approximately 91,300 square feet of low-slope reroofing at Bedford High School and 93,000 square feet of steep-slope reroofing at Monroe Rd Elementary. Bids must include a sworn and notarized criminal background affidavit, a sworn and notarized statement disclosing any familial relationship that exists between the owner or any employee of the bidder and any member of the board, board of directors, or the superintendent of the school district, a sworn and notarized Iran Disclosure Statement, and a sworn and notarized non-collusive affidavit. Any questions, contact Chris Cogan at Intertek-PSI at Christopher.cogan@intertek.com BEDFORD HIGH SCHOOL 8285 JACKMAN RD TEMPERANCE, MI 48182 MONROE RD ELEMENTARY 7979 MONROE RD LAMBERTVILLE MI 48144 You are invited to bid on a re-roofing project at Monroe Rd Elementary (~96,000 SF) and Bedford High School (~78,423 SF). Each school will be a separate Base Bid Item, with some alternates related to sheet metal. Work is scheduled to be performed during the summer of 2026, with completion of the work by end of August, 2026. Each school, or a combination of schools, may be awarded to separate contractors There is an expectation for "Post Bid Interviews" to occur the week of February 2nd , 2026. Selected bidders will be contacted on January 29th , 2026 to set up interview times. All questions and inquiries should be directed to the Consultant in writing by no later than 5:00 PM EST on January 21st , 2026: Architectural Testing, Inc. / Intertek Roof Consulting Department 45000 Helm Street, Suite 200 Plymouth, MI 48170 Attention: Mr. Christopher Cogan (248) 228-7917 cell; christopher.cogan@intertek.com Project Description 1. Work includes removal of the existing asphalt shingle roofing system (~93,000 SF) and recovery of the existing low slope EPDM roofing (~3,000 SF). All roofs on the building are included.

Award

Educational

$1,577,700.00

Public - City

Renovation

22

23

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
10
Bidding Soon
1,877
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 28, 2026

June 15, 2026

Project location map

Multiple Locations, Temperance, MI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.