BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 13, 2025 at 8:00 PM

Updated August 14, 2025

Demolition, site work, paving and renovation of a mixed-use development in New Brighton, Minnesota. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; water / sewer project; for the renovation of a water / sewer project; and for the demolition of a sidewalk / parking lot.

Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing to the Issuing Office. Contact information and submittal procedures for such questions are as follows: 7533 Sunwood Drive NW, Suite 206, Ramsey, MN 55303, (763) 433-2851, fax (763)427-0833 - Question Deadline 07/01/2025 GENERAL A. The WORK to be performed under this Contract shall consist of furnishing all plant, tools, equipment, materials, supplies, and manufactured articles and for furnishing all transportation and services, including fuel, power, water, and essential communications, and for the performance of all labor, work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. The WORK shall be complete, and all work, materials, and services not expressly shown or called for in the Contract Documents which may be necessary for the complete and proper construction of the WORK in good faith shall be performed, furnished, and installed by the CONTRACTOR as though originally so specified or shown, at no increase in cost to the OWNER. 1.2 PROJECT LOCATION A. The project is located in the City of New Brighton which is located in Ramsey County. The project location is shown on the vicinity map in the design drawing set. 1.3 PROJECT DESCRIPTION A. The work hereafter referred to requires the complete construction and start-up necessary for the facility with all required necessary equipment, generally described, but not limited to, in the following paragraphs: 1. Installation of new prepackaged fiberglass lift station with grinder pumps, concrete lid and bituminous driveway. 2. Install new forcemain through existing forcemain 3. Demolition of existing lift station. 4. Connection to control panel.

Award

Water / Sewer

$342,000.00

Public - City

Demolition, Paving, Renovation, Site Work

30

25

2

5

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
47
Bidding Soon
1,537
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2025

August 7, 2025

Project location map

New Brighton Rd, New Brighton, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.