BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 17, 2025 at 8:00 PM

Updated July 15, 2025

Site work for a playground / park / athletic field in Amber, Oklahoma. Completed plans call for site work for a playground / park / athletic field.

Park Pavillon You are invited to submit a bid to supply the items and/or services specified. Bids received after the stated date and time, will not be ac- cepted, and will be returned to the bidder unopened. There will be no exceptions to this policy. All bids will remain on file at least 48 hours thereafter before a pricing contract award will be rec- ommended to the Town Board Trustees. Prior to contract award: Original signatures will be required on the Anti-collu- sion Affidavit. If you have any questions, or need addi- tional information, you may contact the Amber Town Clerk, Kelly Torres, at (405) 222-2175; or by email clerk@- townofamber.com Project Type Construction of a 30x40 Park Pavilion 1. Project Overview The project involves the construction of a 30-foot by 40-foot park pavilion, including site preparation, foundation work using 3500 PSI fiber mesh reinforced concrete, installation of a welded construction kit, underground electrical work, and sheeting of the entire underside of the pavilion to prevent birds from nesting. Upon completion, the surrounding ground must be sloped with topsoil and finished with sod extending at least 20 feet around the perimeter of the pavilion. Additionally, a **park-style barbecue grill will be installed at each end of the pavilion, secured in concrete.** The selected contractor will be responsible for all aspects of construction, ensuring compliance with industry standards and local regulations. 2. Project Timeline - Bid Submission Deadline: 30 days after publication - Project Start Date: To Be Determined (TBD) - Completion Date: TBD 3. Scope of Work - Pavilion Dimensions: **30 feet by 40 feet** - Foundation Work: 3500 PSI fiber mesh reinforced concrete, 12-inch footings, 24x36-inch piers, 3/8-inch rebar reinforcement every 30 inches. - Site Preparation: Built-up ground with adequate compacted soil. - Pavilion Structure: Welded construction kit, assembled and installed per specifications. - Electrical Work: Underground electrical service from the park's central power pole, four (4) weatherproof outlets at 48 inches. - Sheeting: The entire underside of the pavilion will be covered with a durable, weather-resistant material to prevent bird nesting. - Final Grading & Landscaping: Ground must be properly sloped with topsoil and covered with sod extending at least 20 feet around the perimeter of the pavilion. - Barbecue Grills: A park-style barbecue grill must be installed at each end of the pavilion, securely anchored in concrete. Description - Width 30' Length 40' Height 11' Pitch 3" Hip Building 8' Clearance Columns 6 X 6 X 3/16 All rafters 10" 12# Beam Headers running length of building 8" 10# Beam 8" Cee Purlin

Post-Bid

Playgrounds / Parks / Athletic Fields

$450,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
108
Active Projects
51
Bidding Soon
776
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2025

August 13, 2025

Project location map

To Be Determined, Amber, OK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.