Demolition, site work and new construction of a municipal facility in Exeter, Pennsylvania. Completed plans call for the demolition of a municipal facility; for the construction of a municipal facility; and for site work for a municipal facility.
As of August 13, 2025, the project has been awarded to the following: A.R. Popple Tkg & EXC, LLC - $78,000.00 Datom Products, Inc - $57,645.50 with the total awarded amount of $135.645. Bid Security Shall Be Furnished in Accordance With the Instructions to Bidders. The Following Wage Rate Requirements Are Applicable to This Contract: Pa Prevailing Wage Rates. Questions Due Date: Jun 24th 2025, 4:30 PM EDT Online Portal Bidder Must Ensure That Employees and Applicants for Employment Are Not Discriminated Against Because of Their Race, Religion, Color, Handicap, National Origin, Age or Sex. West Pittston Borough Does Not Discriminate on the Basis of Race, Color, National Origin, Sex, Religion, Age, Disability, or Familial Status in Employment or the Provision of Services. Bids will be received for two individual separate prime contracts. Bids shall be on a Unit Price basis as indicated on the Bid Form. This work is the furnishing, installing, maintaining, and relocating of traffic control devices for vehicular and pedestrian traffic. This work may include flagging and pilot car operation for guidance of traffic through the temporary traffic control zone and dust control. All work shall be done as specified in these Specifications, PennDOT Publication 212, PennDOT Publication 213, and the FHWA Manual on Uniform Traffic Control Devices (MUTCD), PennDOT Standard Drawings, the Drawings and as directed. A. This work consists of the following: 1. Removal of the first 8 inches of topsoil and organic material. 2. Removal of topsoil and organic matter such as trees, stumps, brush, roots, and other vegetation within the limits of grading, including ditches and channels. When indicated, perform tree trimming and selective tree removal outside of the limits of grading as specified. 3. Removal of objectionable material, rubbish, and junk within the project limits. 4. Removal of buildings and structures, fences, walls, guide rail posts, guide rails, signs, direction markers, and other obstructions interfering with the work. 5. Disposal of removed material. 6. Salvaging, temporarily storing, and delivering of material. 7. Obtaining of waste areas for disposal of material as specified. 8. Stockpiling of topsoil mixture as specified. A. This work is total or partial demolition of buildings and other structures, as indicated. The following definitions apply: 1. Total Demolition. Total demolition and removal of indicated buildings and other structures. 2. Partial Demolition. Partial demolition and removal of indicated buildings and other structures. Demolish and remove only the portion as indicated, unless the owner of the remaining portion requests and authorizes total demolition in writing. 3. Remove or Demolish: Remove and legally dispose of items except those indicated to be reinstalled, salvaged, or to remain the Owner's property. 4. Remove and Salvage: Items indicated to be removed and salvaged remain the Owner's property. Remove, clean, and pack or crate items to protect against damage. Identify contents of containers and deliver to Owner's designated storage area. 5. Remove and Reinstall: Remove items indicated; clean, service, and otherwise prepare them for reuse; store and protect against damage. Reinstall items in locations indicated. 6. Existing to Remain: Protect construction indicated to remain against damage and soiling during demolition. When permitted by the Owner, items may be removed to a suitable, protected storage location during demolition and then cleaned and reinstalled in their original locations. A. This work is excavation for sites, roadways, roadway appurtenances, sidewalks, structures, ditches, stream channels, culverts and drains, pipes, utilities and cleaning of existing ditches and includes the following: 1. Excavation as shown on PennDOT Standard Drawings, for roadways, shoulders, ditches, drainage structures, stream channels, grade separation structures, retaining walls, and wingwalls. 2. Excavation, as indicated or directed, for benches and for the removal of existing pavements not being rehabilitated. 3. Excavation, as indicated or directed, for the removal of unsuitable material. Saw cut as necessary. 4. Excavation, as indicated or directed, to allow for the placement of topsoil. 5. Excavation and stockpiling, as indicated or directed, for the removal of topsoil other than the first 8 inches, which are incidental to the clearing and grubbing operations. 6. Removal of unforeseen slides and rock ledges. 7. Removal of stone fences, piles of dirt or stones, individual boulders, and any portions of structures above the natural ground. 8. Excavation for roadway rehabilitation, sawcutting and removal of existing pavement to neat lines, as indicated or directed. 9. Excavation for inlet, outlet, and parallel ditches; stream channels; structures removed below the ground surface and not replaced with new structures; spillways; and half-circle pipe. 10. Excavation for new grade separation structures, drainage structures, sanitary sewer structures, new retaining walls, abutments, piers, and wingwalls. 11. Excavation for pipe culverts including storm and sanitary; pipe-arches; metal plate pipe; metal plate pipe-arches; standard endwalls for pipe culverts and pipearches; and excavation in excess of the standard depth for pavement base drains, pipe underdrains, subsurface drain outlets, and subgrade drains. A. This work consists of the following: 1. The separation and salvaging of topsoil or topsoil mixture encountered in grading the project and depositing it in stockpiles at locations on or adjacent to the project site. 2. The furnishing and placing of topsoil from outside the project, as indicated. 3. The preparation of indicated areas and the placement of topsoil or topsoil mixture on the prepared areas, using topsoil or topsoil mixture removed from stockpiles located on the project or from other indicated areas. 4. The furnishing and placing of seed and soil supplements of the type indicated, the application of herbicides, and mowing requirements. 5. The furnishing, placing, anchoring, and maintaining of mulch of the type indicated.
Award
Municipal
$135,645.00
Public - City
Demolition, New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 27, 2025
July 28, 2025
1308 Wyoming Ave, Exeter, PA
Related To This Project
Exeter, PA
Bid Date: Sep 15 2025
Exeter, PA
Bid Date: Nov 06 2025
Exeter, PA
Bid Date: Jun 27 2025
Exeter, PA
Bid Date: May 01 2025
Exeter, PA
Bid Date: Jan 31 2025
Exeter, PA
Bid Date: Dec 30 2024
Exeter, PA
Bid Date: Sep 03 2020
Exeter, PA
Bid Date: Jun 11 2024
Exeter, PA
Bid Date: Jun 06 2024
Exeter, PA
Bid Date: Apr 02 2024
Exeter, PA
Bid Date: Jun 24 2020
Exeter, PA
Bid Date: Jan 03 2022
Exeter, PA
Bid Date: Dec 16 2021
Exeter, PA
Bid Date: Dec 22 2021
Exeter, PA
Bid Date: Oct 06 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.