BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 15, 2026 at 8:00 PM

Updated August 17, 2026

Demolition, site work, paving and new construction of a municipal facility in Exeter, Pennsylvania. Completed plans call for the construction of a municipal facility; and for the demolition of a municipal facility.

Base Bid : Parking Lot Excavation, 260 C.Y. , 2,700 S.Y. of Superpave Base Course, 25 mm , 2,700 S.Y. of Superpave Wearing Course , 9.5 mm , Demolition of Existing Salt Shed , Construction of New Salt Shed, Construction of New Metal Building, stormwater inlets and piping, and Site Restoration . 1. Demolition of Existing Salt Shed, 2. Parking Lot excavation, 6 inch depth, 3.Install Stormwater piping & Inlets as shown, 4. Install electrical conduit as shown, 5. Providing undercut with coarse aggregate where directed, 6. Construction of base course, 25mm, 4 1/5 inch depth, 7. Construction of wearing course, 9.5mm , 1.5 inch depth, 8. Install Concrete Pad for Salt Shed, 9. Install Salt Shed, Metal Building, and material storage bays, 10. Install all electrical appurtenances, 11 . Maintenance and protection of traffic Bonds: 100% Performance Bond, 100% Payment Bond, 100% Other Bond. Question Deadline 09/03/2026 at 4:00 PM ET All questions must be submitted to the Engineer in writing via the "ask a question" feature in Online.

GC Bidding

$1,500,000.00

Public - County

Subscribe For Documents

No Data

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
386
Active Projects
181
Bidding Soon
2,963
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 10, 2026

November 9, 2026

Project location map

2305 PA-92, Exeter, PA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.