Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 12, 2025 at 8:00 PM
Updated August 13, 2025
Site work for a civil project in Madison, Wisconsin. Completed plans call for site work for a water / sewer project.
This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. In general, the work consists of: Piping alterations in the existing water treatment facililities (Structure 50) to facilitate the segregation of backwash waste and source overflow to a new submersible lift station (Structure 55 - Backwash Waste Lift Station) to be constructed adjacent to Structure 50. The lift station shall convey collected flows to existing lagoons to the east via a 6-inch force main. The existing lagoons will be altered to operate as settling lagoons in series, with work at the lagoons to include a submerged inlet, connecting piping, outfall structure, and access improvements. Base Bid will be received for: A single lump sum bid for All Work.Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Estimate construction budget $1,200,000
Award
Water / Sewer
$1,192,000.00
Public - State/Provincial
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 2, 2025
August 1, 2025
To Be Determined, Madison, WI
Related To This Project
Madison, WI
Bid Date: Jun 18 2025
Madison, WI
Bid Date: Jul 24 2025
Madison, WI
Bid Date: Jul 24 2025
Madison, WI
Bid Date: Jul 22 2025
Madison, WI
Bid Date: Jul 29 2025
Madison, WI
Bid Date: Aug 05 2025
Madison, WI
Bid Date: Aug 20 2025
Madison, WI
Bid Date: Aug 06 2025
Madison, WI
Bid Date: Jun 30 2025
Madison, WI
Bid Date: Jun 19 2025
Madison, WI
Bid Date: Jul 01 2025
Madison, WI
Bid Date: Jul 15 2025
Madison, WI
Bid Date: Aug 05 2025
Madison, WI
Bid Date: Jul 01 2025
Madison, WI
Bid Date: Jul 01 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
