BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Site work for a civil project in Madison, Wisconsin. Completed plans call for site work for a water / sewer project.

This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening, DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. In general, the work consists of: Piping alterations in the existing water treatment facililities (Structure 50) to facilitate the segregation of backwash waste and source overflow to a new submersible lift station (Structure 55 - Backwash Waste Lift Station) to be constructed adjacent to Structure 50. The lift station shall convey collected flows to existing lagoons to the east via a 6-inch force main. The existing lagoons will be altered to operate as settling lagoons in series, with work at the lagoons to include a submerged inlet, connecting piping, outfall structure, and access improvements. Base Bid will be received for: A single lump sum bid for All Work.Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted. Estimate construction budget $1,200,000

Award

Water / Sewer

$1,192,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
273
Active Projects
164
Bidding Soon
1,647
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 2, 2025

August 1, 2025

Project location map

To Be Determined, Madison, WI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.