BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 12, 2025 at 8:00 PM

Updated August 13, 2025

Site work for a civil project in Butler, Tennessee. Completed plans call for site work for a water / sewer project.

The work included under these specifications and the accompanying drawings consists of providing all items, articles, materials, operation, or methods listed, mentioned, or scheduled on the drawings and/or herein including all labor, materials, equipment, services, and incidentals necessary for their completion. The intent of this contract is to provide for the Water System Upgrades - Contract III, Horseshoe Cove in Carter County, TN for the Carderview Utility District. Work includes the installation of a 4" water line, new pump station, valves, appurtenances, and all other work detailed in the Technical Specifications and Construction Drawings. The work to be bid on is as follows: New Pump Station and Water Line Upgrades in Horseshoe Cove for the Carderview Utility District. The allotted time for construction is 90 Calendar Days. This Project is being Funded by the Johnson County ARP Funds. All Minority and Women-owned contractors are encouraged to participate. No bidder may withdraw his bid within 30 days after the actual date of the submittal thereof. Bidders are instructed to read and sign off on the Contract Provisions for Non-Federal Entity Contracts Under Federal Awards in these Contract Documents following the Supplemental Conditions. Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement. A Bid must be accompanied by Bid security made payable to Owner in an amount of 5%. percent of Bidder's maximum Bid price (determined by adding the base bid and all alternates) and in the form of a certified check, bank money order, or a Bid bond (on the form included in the Bidding Documents) issued by a surety meeting the requirements of Paragraphs 6.01 and 6.02 of the General Conditions. Doc note: The information for Bidders, Bid Form, Form of Agreement, Drawings, Specifications, Bid Bond, Performance Bond, Payment Bond information, and other contract documents may be examined at the address below Carderview Utility District, 291 Piercetown Road, Suite 2, Butler, TN 37640 W&W Engineering, 130 West Summer Street, Suite 3, Greeneville, TN 37743. The OWNER reserves the right to waiver any informalities or reject all bids.

Post-Bid

Water / Sewer

$400,000.00

Public - County

Site Work

5

19

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2025

August 1, 2025

Project location map

Horseshoe Cove Dr, Butler, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.