Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 9, 2025 at 8:00 PM
Updated November 20, 2025
Site work and paving for a mixed-use development in Madison, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
This project generally consists of replacement and installation of sanitary sewer pipes and structures, water main, storm sewer pipes and structures, and replacement of street infrastructure including curb and gutter, pavement, sidewalk, driveway aprons, and installation of tree support systems, rain gardens, pavement marking, and signing. Much of the project takes place between East Main Street from S Webster St to S Blair St and S Hancock St from East Washington Ave to south of E Wilson St. Franklin St from E Wilson St to Johnson St and North Hancock from East Washington Ave to Johnson St have been added to the scope of work for pavement markings only. Additionally, there are 4 sites added to the project primarily involving concrete work and related activities: the northwest corner of N Hancock St and East Washington Ave, W Wilson St from S Bassett St to S Henry St, S Broom St from W Wilson St to W Doty St, and the corner of E Wilson St and King St. If you have any questions, please call Alane Boutelle at 608-267-1197. SBE(4%) Questions regarding SBE Program requirements may be directed to Tracy Lomax, Affirmative Action Division. Tracy may be reached at (608) 267-8634, or by email, TLomax@cityofmadison.com. PREQUALIFICATION APPLICATION: Forms are available on our website If not currently prequalified in the categories listed in Section A, an amendment to your Prequalification will need to be submitted prior to the same due date. Postmark is not applicable. A portion of the work under this contract shall be completed in 2025 with the remaining work completed in 2026. All work, including surface asphalt along S Hancock St south (cul-de-sac) of E Wilson St shall be completed by November 7, 2025. If additional work is completed beyond what is required in 2025, and the remainder of the work is split between 2025 and 2026, all work shall be completed by September 4, 2026. If the Contractor elects to complete all remaining work under this contract in 2026, all remaining work shall be completed within ONE HUNDRED SIXTY-FIVE (165) CALENDAR DAYS or by September 18, 2026, whichever is sooner.
Award
Water / Sewer
$4,957,000.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 25, 2025
August 25, 2025
Multiple Locations, Madison, WI
Related To This Project
Madison, WI
Bid Date: Jul 01 2025
Madison, WI
Bid Date: Jul 01 2025
Madison, WI
Bid Date: Aug 05 2025
Madison, WI
Bid Date: Jul 15 2025
Madison, WI
Bid Date: Jul 01 2025
Madison, WI
Bid Date: Jun 19 2025
Madison, WI
Bid Date: Jun 30 2025
Madison, WI
Bid Date: Jul 02 2025
Madison, WI
Bid Date: Aug 05 2025
Madison, WI
Bid Date: Jul 15 2025
Madison, WI
Bid Date: Jul 11 2025
Madison, WI
Bid Date: Jun 12 2025
Madison, WI
Bid Date: Jun 23 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.