Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Site work and paving for a sidewalk / parking lot in Aurora, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Reference Number 0000390585 Construction curb ramp, curb, curb and gutter, concrete median, concrete pavement, Sidewalk, and hot mix asphalt (patching) Tree removal, gravel removal, curb and asphalt mat removal Erosion control The proposed improvements for this area include the construction of an 8-foot-wide concrete sidewalk in the space that was previously occupied by gravel. This enhancement aims to improve pedestrian access and safety, providing a durable and long-lasting pathway for public use. Work not specifically called for, but necessary to perform the contract work will be considered incidental to the contract whether specifically detailed or not. Question Deadline 06/27/2025 at 5:00 PM MT Questions are submitted online No, Bidders may make written inquiries concerning this ITB to obtain clarification of requirements. Written inquiries shall be emailed to: Angie Young, Senior Procurement Agent, at ayoung@auroragov.org AND Jacob DeBernardi, Project Manager, at jdeberna@auroragov.org. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Each Bid shall be accompanied by an appropriate guarantee in the form of a Bid Bond made payable to the City of Aurora in an amount of not less than five percent (5%) of the amount of the Bid. Original bid bonds do not have to be mailed; however, each bidder should maintain the original on file should the City request it at a later time. The Contract Documents require that all work be completed no later than October 31, 2025 after issuance of Notice to Proceed. Failure to complete the work as prescribed shall be considered as a Breach of Contract and subject to Liquidated Damages which are $1,500.00 per day. The estimated cost for this project is from $380,000.00 to $410,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The City of Aurora reserves the right to reject any and all Bids, to waive informalities and irregularities, and to accept that bid which is considered to be in the best interest of the City.

Award

Sidewalks / Parking Lot

$116,591.00

Public - City

Paving, Site Work

7

13

2

5

Subscribe For Documents

76 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
67
Bidding Soon
1,181
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2025

August 11, 2025

Project location map

S Havana St & E Florida Ave, Aurora, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.