BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2025 at 8:00 PM

Updated July 30, 2025

Site work for a water / sewer project in Aurora, Colorado. Completed plans call for site work for a water / sewer project.

Reference Number 0000391447 Aurora Water underwent a study to identify facilities that were no longer in use and can come off-line within the near future. This phase of the project involves the demolition of the Prologis Lift Station and the abandonment of the associated 8-inch force main up to exist flow meter manhole. The site will be graded and restored to pre-existing conditions. All above ground appurtenances will be removed to 3-feet below grade and all below grade structures will be filled with sand. Aurora Water Operations discovered issues at the storm structure at the 6th Ave and Del Mar Circle locations. Operations were notified of a sinkhole forming in the roadway because of a collapsed corrugated metal pipe (CMP) storm pipe. However, the City has no record of the CMP's existence and it was not in the City's GIS system. The initial site investigation found the CMP operates as the low point of the local storm system leading to the pooling of water in the structure. Staff suspects the CMP pipe corroded due to age which led to the collapse and failure of the roadway. PRE-QUALIFICATION Prime Contractors have been pre-qualified for this Invitation to Bid. Bids shall not be accepted from firms other than those pre-qualified firms on this solicitation. This advertisement is for the sole purpose of identifying this procurement action to potential subcontractors who may wish to participate through the selected prime contractor. Question Deadline 07/09/2025 at 2:00 PM MT Questions are submitted online No, Any questions must be submitted in writing by email to Heidi Ellis, Senior Procurement Agent at heellis@auroragov.org and Zachary Tredwell-Torpie, Project Manager at ZTredwel@auroragov.org. Questions will be answered via addendum posted to online. Pre-bid conference: In the event that this link does not work, interested firms shall email Heidi Ellis, Senior Procurement Agent at heellis@auroragov.org and provide email address to be invited to the Pre-Bid Conference Teams Meeting. Bonding Requirements - Bid Bond 5 % Each Bid shall be accompanied by an appropriate guarantee in the form of a Bid Bond made payable to the City of Aurora in an amount of not less than five percent (5%) of the amount of the Bid. In addition, the bid guarantee shall be accompanied in the same file as the bid. Failure to complete the work as prescribed shall be considered as a Breach of Contract and subject to Liquidated Damages which are $400.00 per day. The Contract Documents require that all work be Substantially Complete by October 1, 2025, with Final Completion by November 1, 2025. The estimated cost for this project is from $200,000.00 to $280,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$280,000.00

Public - City

Site Work

27

19

4

Subscribe For Documents

64 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
167
Active Projects
67
Bidding Soon
1,180
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2025

August 18, 2025

Project location map

E 6th Ave & Del Mar Cir, Aurora, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.