BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 22, 2025 at 8:00 PM

Updated July 23, 2025

Site work for a water / sewer project in Clarksville, Tennessee. Completed plans call for site work for a water / sewer project.

Reference Number 0000390607 Installation of Cured in Place Pipe (CIPP) in Various Locations The work will cover the relining of stormwater drain lines. The City of Clarksville storm water drainage system consists of approximately 332 miles of pipe varying in diameter from 15 inches to 48 inches. The work covered by this contract will be for the installation of Cured-In-Place- Pipe (CIPP) in existing storm water lines that the CITY will select as the need for pipe repair arises. There are no pre-selected locations for this work. As the CITY discovers problems in its system, a work order will be prepared for one or more locations of the sizes enumerated on the bid form. Distances on the work order will be based upon plans or approximate field measurements. The contractor will go to each site and will ascertain the appropriate thickness of the CIPP material needed for the repair and will measure the actual lengths. The CITY will review and approve the design and will inspect the installation. The pipes selected for the work shown in the bid form range in size from 15 inch to 48 inch. The lengths of each run shown on the bid form are set at 100 feet to provide a value for cost extension purposes. The bids will be reviewed for individual pricing versus the bid total to preclude unbalanced bidding. The contract with the selected bidder will be for an estimated value of $500,000 per year. Work orders will be drawn against pertaining contract amounts. The contractor will be paid based upon executed work orders which may not reach the total value of the contract. The price for each size will include all pre and post television work, all "normal" line cleaning, bypass pumping, "tube" insertion and curing as well as any other work needed to complete the CIPP installation. The time for completion of the work is June 30, 2026. General Requirements - Contractors License Required Question Deadline 06/27/2025 at 2:30 PM CT

Award

Water / Sewer

$810,600.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
109
Active Projects
45
Bidding Soon
1,181
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2025

July 31, 2025

Project location map

Multiple Locations, Clarksville, TN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.