Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 3, 2025 at 8:00 PM
Updated July 4, 2025
Site work and paving for a road / highway in Beloit, Wisconsin. Completed plans call for site work for a road / highway; and for paving for a road / highway.
Question Deadline 06/30/2025 All questions about the meaning or intent of the Bidding Documents are to be directed to ENGINEER. Questions received less than three days prior to the date for opening of Bids may not be answered. Town of Turtle 2025 Road Maintenance - to include: Chip seal maintenance (granite cover aggregate) for East Hart Road from approximately 400 feet east of Shopier Road to the concrete pavement south of Clinic Road (11,500 feet +/-). The project will include traffic control, temporary tabbing and re-striping the roadway, restoration of the work area, and other miscellaneous items in conformance with the Contract Documents. An alternate bid for using limestone chips as a cover aggregate will also be requested. The Town of Turtle reserves the right to waive any informalities and to reject any or all Bids. The letting of the work described herein is subject to the provisions of Sections 60.47, 66.0901 and 66.0903, Wisconsin Statutes
Bid Results
Roads / Highways
$114,124.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 2, 2025
August 1, 2025
Multiple Locations, Beloit, WI
Related To This Project
Beloit, WI
Bid Date: Jul 10 2025
Beloit, WI
Bid Date: Jul 23 2025
Beloit, WI
Bid Date: Jul 24 2025
Beloit, WI
Bid Date: Jul 23 2025
Beloit, WI
Bid Date: Jul 30 2025
Beloit, WI
Bid Date: Sep 30 2025
Beloit, WI
Bid Date: Oct 09 2025
Beloit, WI
Bid Date: Jun 26 2025
Beloit, WI
Bid Date: Jun 26 2025
Beloit, WI
Bid Date: May 29 2025
Beloit, WI
Bid Date: May 09 2025
Beloit, WI
--
Beloit, WI
Bid Date: Apr 16 2025
Beloit, WI
Bid Date: Jun 11 2021
Unlock Your Potential with Access to Commercial Construction Data
Sign up now to get free company and project data. No payment required.
