BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 27, 2025 at 8:00 PM

Updated October 28, 2025

Site work for a bridge / tunnel in Victoria, British Columbia. Completed plans call for site work for a bridge / tunnel.

There are twelve (12) culverts in the 2025 Culvert Replacement Program. All twelve culverts are located in the same area, near Hazlitt Creek Road and Ross Durrance Road. The scope of work includes removal of the existing culvert, and replacement with new dual-lined HDPE culverts, all new culverts will require a rock and mortar headwall to be built at each end. Restoration works include all backfill & compaction, compaction testing, repaving the culvert crossing with a single lift of 50mm asphalt, and rebuilding the road shoulders with 100% screened asphalt. Some culvert locations will require additional ditching at the inlets/outlets of the culvert. All extents of the requested additional ditching on-site has been marked out, contractors are encouraged to go to site and have a review.The District of Highlands will provide a dump site for all excavated materials except for asphalt and the existing culverts located on Finlayson Arm Road. Specific details for each location are as described below. Culvert #1: Location: Hazlitt Creek @ Millstream Lake Road Remove existing and install new 300mm culvert 15 meters to the East Reditch approximately 50m west of new culvert location Reditch on the North side of road Culvert #2: Location: 370 Hazlitt Creek Road Remove existing and install new 10m long 600mm HDPE culvert Reditch approximately 5 meters on the Northeast corner Reditch approximately 10 meters on the Southeast side of the road Reditch approximately 10 meters on the Southwest side of the road Culvert #3: Location: 375 Hazlitt Creek Road Remove existing and install new 10m long 450mm HDPE culvert Reditch approximately 5 meters on the Northwest side of the road Reditch approximately 20 meters on the Northeast side of the road Culvert #4: Location: Hazlitt Creek @ Old Mossy Remove existing and install new 11m long 450mm HDPE culvert Reditch approximately 5 meters and clean up on the Northwest corner of the road. Culvert #5: Location: 390 Hazlitt Creek Rd Remove existing and install new 7m long 450mm HDPE culvert Reditch approximately 45 meters on the Northeast side of the road Reditch approximately 10m on the Northwest side of the road. Culvert #6: Location: 100m North of 270 Old Mossy Road Remove existing and install new 12m long 450mm HDPE culvert Reditch approximately 72 meters on the Northwest side of the road Culvert #7: Location:270 Old Mossy Road Remove existing and install new 10m long 300mm HDPE culvert Culvert #8: Location:245 Old Mossy Road Remove existing and install new 18m long 450mm HDPE culvert Culvert #9: Location: 50m South of 245 Old Mossy Road. Remove existing and install new 12m long 450mm HDPE culvert Culvert #10: Location: 80m South of 220 Old Mossy Road Remove existing and install new 8m long 300mm HDPE culvert Reditch approximately 40m on the Northwest side of the road Reditch approximately 20m on the Southeast side of the road Culvert #11: Location: 215 Old Mossy Road Remove existing and install new 10m long 450mm HDPE culvert Reditch approximately 15m on the Northeast side of the road Culvert #12: Location: 130 Ross Durrance Road Remove and dispose of the existing culvert, backfill and prep for paving (approximately 16m2) Documents can be obtained from www.bcbid.gov.bc.ca Question Deadline 06/27/2025 at 3:00 PM PT

Award

Bridges / Tunnels

$202,540.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
334
Active Projects
152
Bidding Soon
3,298
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2025

August 18, 2025

Project location map

Multiple Locations, Victoria, BC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.