Published August 27, 2025 at 8:00 PM

Updated August 28, 2025

Site work for a civil project in Bemidji, Minnesota. Working plans call for site work for a water / sewer project.

As of August 27, 2025. bids received were rejected as they were over the budget. No definite date for the rebid. TYPE OF BIDS. Single combined bids will be received for all portions of the work. The successful bidder will be the single Prime Contractor for the Project. Est. Completion Date: Oct. 31, 2025 The area housing the Dissolved Air Filtration (DAF) tank is to be repurposed into a garage. This includes removal and demolition of the equipment, piping, conduit, etc. associated with the DAF Tank. Remove knockout panel for new garage door on the south side of the building. This will include relocation of an overhead water pipe. Remove and replace curb and add apron for overhead door. Demo and replace electrical items. Demo and patch slab for interceptor tank below grade. Electrical for owner compressor. Existing Heat Recovery Unit and duct to be removed. Relocate existing unit heater. Add unit heater and associated MEP items. Install wall exhaust fan with duct and damper. Patch CMU wall at removed louver. Alternate bid for epoxy flooring. See drawings and specs. Include any surface cleaning, grinding or other prep necessary. BID SECURITY. Bid Security in the amount of five (5%) percent of the Bid including all add alternates, must accompany each Bid in accord with the Instructions to Bidders 00 1000.7. Cash, Bidders Bond, cashier's checks or certified checks will be accepted. TIME OF COMPLETION AND LIQUIDATED DAMAGES. Successful bidder shall begin the work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time of 100% completion by October 31, 2025. If the contractor fails to complete the work within the contract time, the Contractor shall pay to the Owner as liquidated damages, the sum of $500 per day past the agreed completion date.

Final Planning

Water / Sewer

$66,400.00

Public - City

Site Work

27

15

2

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
17
Bidding Soon
144
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 15, 2025

February 27, 2026

Project location map

412 Irving Access Loop SW, Bemidji, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.