Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 30, 2025 at 8:00 PM
Updated October 1, 2025
Demolition, site work, paving and new construction of a civil project in Bemidji, Minnesota. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
Bemidji Township (the "Township") invites written Quotes from qualified bridge-maintenance contractors to perform priority repairs at Bridge #04520, located on Yellowhead Road (Township Route 998) over the Mississippi River. The work is strictly maintenance; no structural modifications are required. 2. SCOPE OF WORK - PRIORITY TASKS 1. Priority 1 - Remove and dispose of approximately 3,000 square feet (+-30 %) of damaged or settled grouted rip-rap. 2. Priority 2 - Install new Class I grouted rip-rap to original grades and re-grout all joints to prevent water intrusion. 3. Priority 3 - Drill exploratory holes through the concrete approach slab to identify any sub-slab voids. 4. Priority 4 - Pressure-grout detected voids to restore full bearing under the approach slab. All materials and workmanship shall comply with the 2020 MnDOT Standard Specifications for Construction. 3. PERMITS Contractor shall be responsible for any/all permits related to, or necessary to complete the work including but not limited to work adjacent to water, erosion control, DNR etc. 4. TRAFFIC CONTROL A full closure of Yellowhead Road at the bridge site is allowed for up to 48 consecutive hours. The Contractor shall develop and implement a Temporary Traffic Control Plan in accordance with the Minnesota Manual on Uniform Traffic Control Devices (MUTCD), including advance warning signage and local detour routing. Traffic control devices shall be maintained at all times during the closure. Site Directions: Yellowhead Road (Township Route 998) over the Mississippi River. 5. SCHEDULE The Township anticipates issuing a Notice to Proceed in August 2025. All work, including site restoration, must be substantially complete by **October 22, 2025** 6. AS-BUILTS NARRATIVE AND DOCUMENTATION Prior to completion of the final inspection, the Contractor shall provide to Owner an as-built narrative and documentation of all work completed in the maintenance and Repair of Bridge #04520. 7. CONTRACTOR QUALIFICATIONS Completion of at least two bridge rip-rap or grout maintenance projects within the last five years. Demonstrated ability to pressure-grout approach slabs and manage riverfront erosion control. MnDOT Pre-qualification Work Type 5.51 (Bridge Deck Rehabilitation) or equivalent experience. The plans associated with this project (the download) are the original bridge plans for informational purposes only. The work associated with this project is strictly maintenance; no structural modifications are required. All inquiries shall be directed to: Peter Fredrickson - Township Administrator Email: bemtwnsp@paulbunyan.net Phone: 218-333-3617 Brian Floria - Township Supervisor Email: brian.floria@gmail.com
Post-Bid
Bridges / Tunnels
$104,290.00
Public - City
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 7, 2025
September 8, 2025
Yellowhead Rd SW, Bemidji, MN
Related To This Project
Bemidji, MN
Bid Date: Jul 29 2025
Bemidji, MN
Bid Date: Aug 20 2025
Bemidji, MN
Bid Date: Sep 10 2025
Bemidji, MN
Bid Date: Oct 06 2025
Bemidji, MN
Bid Date: Oct 07 2025
Bemidji, MN
Bid Date: Oct 16 2025
Bemidji, MN
Bid Date: Jul 22 2025
Bemidji, MN
--
Bemidji, MN
Bid Date: Jul 15 2025
Bemidji, MN
Bid Date: Jul 17 2025
Bemidji, MN
Bid Date: Jun 20 2025
Bemidji, MN
Bid Date: Jun 10 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
