Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 29, 2025 at 8:00 PM
Updated July 30, 2025
Demolition and site work for a transportation facility in Bemidji, Minnesota. Completed plans call for site work for a transportation facility; and for the demolition of a transportation facility.
LOUCKS PROJECT NO. 17343.0D The Demolition of work consists of demolishing a one-story metal shed approximately 3,700 square feet, a two-story brick building approximately 13,000 square feet, a one-story block building approximately 4,900 square feet. The building demolition removal of all asbestos-containing and hazardous materials. Demolition will also include removal of surface and below grade improvements, removal and capping of utilities and restoration and repair of surface improvements as described in these Plans and Project Manual. The Soil Remediation and Earthwork portion of the project will involve preparing the site environmentally and geotechnically for future YMCA/Childcare facility, and three Mixed-Use Buildings. The soil remediation consists of exporting approximately 10,000 tons of contaminated soil to a regulated landfill, approximately 30,000 cubic yards on-site management of Industrial/Commercial SRV's urban fill soils, approximately 10,000 cubic yards of geotechnical correction of common excavation and peat/swamp soils, and import of approximately 65,000 cubic yards of granular soils for backfilling and/or filling of site as described in these Plans and Project Manual. Question Deadline 07/09/2025 at 4:00 PM CT Contractor must submit all requests for interpretations/information with the Engineer to Jon Knutson (jknuston@loucksinc.com) The Engineer must receive requests for information or clarification no later than Tuesday Site Directions: The contemplated work is located on the approximate 15 acre Bemidji Rail Corridor Property located along the southerly edge of downtown Bemidji, Minnesota. The property is located between west of the Mississippi River, east of Park Ave, south of 2nd Ave NW, and north of the BNSF railroad. Est. Completion Date: Oct. 31, 2025
Post-Bid
Transportation Terminals
$300,000.00
Public - City
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 22, 2025
August 7, 2025
101 Minnesota Ave SW, Bemidji, MN
Related To This Project
Bemidji, MN
Bid Date: Aug 07 2025
Bemidji, MN
Bid Date: Jul 29 2025
Bemidji, MN
Bid Date: Aug 20 2025
Bemidji, MN
Bid Date: Sep 10 2025
Bemidji, MN
Bid Date: Oct 06 2025
Bemidji, MN
Bid Date: Oct 07 2025
Bemidji, MN
--
Bemidji, MN
Bid Date: Jul 15 2025
Bemidji, MN
Bid Date: Jul 17 2025
Bemidji, MN
Bid Date: Jun 20 2025
Bemidji, MN
Bid Date: Jun 10 2025
Bemidji, MN
Bid Date: Jun 10 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
