Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 16, 2025 at 8:00 PM
Updated July 17, 2025
Site work for a water / sewer project in Leighton, Alabama. Completed plans call for site work for a water / sewer project.
The work of providing labor, equipment, and material for the Proposed Leighton Collection System Upgrade and Rehabilitation Project Contract No. 2 - Sanitary Sewer Rehabilitation Project - CWSRF . The principal items of work are detailed herein below: o Approximately 4,100 L.F. of Gravity Sewer Line Rehabilitation (Cured In Place Pipe Method) o Approximately 18 Manhole Rehabilitations o Sewer Service Reconnections The successful bidder must furnish a Performance Bond for one hundred (100%) of the bid amount and a Payment Bond for one hundred (100%) percent of the bid amount and must secure his bond from a bonding company's representative or agent in the State of Alabama. The contractor shall note that funds for this project are provided through CWSRF (Clean Water State Revolving Funds). All Applicable Federal Guidelines must be met. There will not be a Pre-Bid meeting. The Contractor is hereby advised that TIME IS OF THE ESSENCE on this project and that the contract time of 60 consecutive calendar days total and noted restrictions shall be strictly observed. LIQUIDATED DAMAGES WILL BE ASSESSED IF CONTRACT TIME IS EXCEEDED. The Contractor may apply for an extension of time in accordance with the provisions of the contract; however, such an extension must be approved prior to the contract completion date to avoid the imposition of liquidated damages. The Contract will be awarded to the lowest responsible and responsive Bidder. No bid may be withdrawn after the time for opening bids has passed. The Owner reserves the right to hold the bids for a period of sixty (60) days after the date of receiving the Bids. The Contract maybe awarded to the lowest, responsible, responsive bidder. The Owner reserves the right to reject any or all bids, to waive any informality in any bid, and to accept any bid considered advantageous to the Owner. Doc Notes :No refunds will be made except to Prime Contractor Bidders, which shall be refunded for one bid set. All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. Questions received less than ten days prior to the date for opening of Bids may not be answered.
Bid Results
Water / Sewer
$301,495.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 15, 2025
August 14, 2025
Multiple Locations, Leighton, AL
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
