Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published September 3, 2025 at 8:00 PM
Updated September 4, 2025
Renovation of a water / sewer project in San Miguel, California. Completed plans call for the renovation of a water / sewer project.
The Owner's Prime Contractor will provide equipment installation and conduct and coordinate equipment testing and start-up. DOC NOTE: Prospective Bidders are urged to register with the designated website as a plan holder, even if Bidding Documents are obtained from a plan room or source other than the designated website in either electronic or paper format. The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website. Bids are requested for the following Contract: Switchboard Electrical Equipment for the Machado Wastewater Treatment Facility (WWTF) Upgrade and Expansion Goods and Special Services A. Seller shall furnish the Goods and Special Services as specified or indicated in the Procurement Contract Documents. The Goods and Special Services are generally described as follows: Switchboard Electrical Equipment for the Machado WWTF Upgrade & Expansion. 1.02 The Project A. The Project, of which the Goods and Special Services are a part, is generally described as follows: The construction, commissioning, and warranty phase of the Machado Wastewater Treatment Facility Upgrade, which includes: new influent lift station, headworks, flow equalization, a 0.325 million gallon per day average daily flow Membrane Bio-Reactor package facility, UV disinfection, recycled water effluent pumping station, biosolids dewatering, new office and laboratory facilities, new maintenance and equipment storage facilities, new and upgrade / modernization of electrical and controls facilities, new back-up power generation, and new groundwater monitoring wells. Question Deadline 07/29/2025 All questions about the meaning or intent of the Procurement Bidding Documents are to be submitted to Engineer and Project Owner in writing at: Kelly Dodds, Owner, at kelly.dodds@sanmiguelcsd.org Bryan Childress, Engineer, at BryanC@wallacegroup.us Garrett Otto, Engineer, at gotto@ottoelectrical.com Heather Freed, District Engineer, at hfreed@wsc-inc.com
Award
Water / Sewer
$68,160.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
