Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 3, 2025 at 8:00 PM
Updated July 11, 2025
Site work and paving for a mixed-use development in Muncie, Indiana. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
The Project includes the construction of an approximately 0.54 mile (2,850') long, 10' wide HMA trail along north of 23rd Street from 260' East of Cowan Road to Gharkey Street within the Muncie, Delaware County, and the Muncie Industrial Center. The proposed work shall include clearing and grubbing, demolition, tree removal, erosion and sediment control measures and surface restoration, trail construction, approaches and driveway reconstruction, and drainage structures installation as set forth in the contract document. In addition, work shall also include a partial trail construction at the railroad located approximately, 3,930' South of 23rd Street along Cowan Road as shown in design plans. Each bid shall be accompanied by a certified check or acceptable bidder's bond made payable to the Owner, in a sum of not less than five percent (5%) of the total amount bid, which check, or bond will be held by the Owner as evidence that the bidder will, if awarded the contract, enter into the same with the Owner upon notification from Owner to do so within ten (10) days of said notification. Approved performance and payment bonds guaranteeing faithful and proper performance of the Work and materials, to be executed by an acceptable surety company, will be required of the Contractor at the time of contract execution. The bonds shall be in the amount of 100% of the Contract Price and must be in full force and effect throughout the term of the Construction Contract plus a period of twelve (12) months from the date of substantial completion. Any contractor awarded work as part of this project shall be required to submit an executed E-Verification Affidavit. An approved maintenance bond guaranteeing the Work to be executed by an acceptable surety company will be required of the Contractor. The maintenance bond in the amount of 100% of the final Contract price must be in effect at the date of final completion of the Project and acceptance by the Owner and remain in effect for a period of three (3) years from the date of Owner's acceptance. The Owner reserves the right to reject any or all bids, and to waive any and all informalities in bidding. Question Deadline 07/03/2025 Bidders may submit questions to the Engineer, in writing, to Chris Waidner, P.E. at cwaidner@vsengineering.com or VS Engineering, 4275 North High School Road, Indianapolis, IN 46254
Post-Bid
Roads / Highways
$2,000,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 10, 2025
September 8, 2025
Multiple Locations, Muncie, IN
Related To This Project
Muncie, IN
Bid Date: Jul 23 2025
Muncie, IN
Bid Date: Jun 25 2019
Muncie, IN
Bid Date: Jul 23 2025
Muncie, IN
Bid Date: Jul 31 2025
Muncie, IN
Bid Date: Jul 31 2025
Muncie, IN
Bid Date: Feb 14 2019
Muncie, IN
Bid Date: Aug 26 2025
Muncie, IN
Bid Date: Aug 14 2025
Muncie, IN
Bid Date: Jul 09 2025
Muncie, IN
Bid Date: Jul 16 2025
Muncie, IN
Bid Date: May 28 2025
Muncie, IN
Bid Date: May 29 2025
Muncie, IN
Bid Date: Jun 03 2025
Muncie, IN
Bid Date: Jun 06 2025
Muncie, IN
Bid Date: May 16 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
