BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 29, 2025 at 8:00 PM

Updated August 30, 2025

Demolition, site work, renovation and addition to a mixed-use development in Glen Ellyn, Illinois. Completed plans call for the addition of a three-story above grade educational facility; for the demolition of a educational facility; for the renovation of a educational facility; for site work for a educational facility; and water / sewer project.

This phase of the project features a four-story classroom addition along with a three-story learning commons addition being constructed on the north side of the existing school. With the first bid release, Gilbane is accepting bids for the earthwork, concrete foundations, & structural steel required to get the project started in the fall of 2025 and will release the balance of bid packages in September 2025. Foundation work includes the installation of rammed aggregate piers, frost walls and footings for the learning commons, and full height foundation walls for the 100 level of the building. Structural steel and composite slabs will be utilized for the above grade structure with stairs & misc. metals being bid within a separate bid package. Interior renovation scope for the summers of 2026 & 2027 will be minimal for the below listed bid packages. Sitework included within this phase of work includes tree removal, site clearing & rough grading, foundation excavation & backfill, and site utilities including stormwater, sanitary sewer, and water service. The addition is expected to break ground November 2025 and be complete in May 2027. BID RELEASE 6.1 - BID PACKAGES BP6.1 Description 03A.6 Concrete Work 05A.6 Structural Steel Work 31A.6 Site Demo, Earthwork and Site Utilities Work 31B.6 Rammed Aggregate Piers. The last day for bidders questions will be Friday, August 8, 2025, at 5:00 p.m. Questions regarding the qualification application procedure should be directed to Yvonda Royster at 312-614-3913 or yroyster@gilbaneco.com. Bid Security in the form of a bid bond in an amount equal to ten percent (10%) of the base bid is required from all Bidders. No other forms of Bid Security will be accepted. Guarantee Bonds in the form of a Performance Bond and Labor and Material Payment Bond in an amount equal to one hundred percent (100%) of the bid may be required from the awarded Bidder.

Post-Bid

Educational

$80,000,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
111
Active Projects
7
Bidding Soon
2,526
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2025

October 15, 2025

Project location map

670 Crescent Blvd, Glen Ellyn, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.