Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 20, 2025 at 8:00 PM
Updated August 21, 2025
Demolition and site work for a water / sewer project in Aurora, Colorado. Completed plans call for the demolition of a water / sewer project.
Reference Number 0000391713, 526729, 134811, 5990A Aurora Water underwent a study to identify facilities that were no longer in use and can come off-line within the near future. This phase of the project involves the demolition of the Prologis Lift Station and the abandonment of the associated 8-inch force main up to exist flow meter manhole. The site will be graded and restored to pre-existing conditions. All above ground appurtenances will be removed to 3-feet below grade and all below grade structures will be filled with sand. PRE-QUALIFICATION Prime Contractors have been pre-qualified for this Invitation to Bid. Bids shall not be accepted from firms other than those pre-qualified firms on this solicitation. This advertisement is for the sole purpose of identifying this procurement action to potential subcontractors who may wish to participate through the selected prime contractor. Question Deadline 07/15/2025 at 2:00 PM MT Questions are submitted online No, Any questions must be submitted in writing by email to Heidi Ellis, Senior Procurement Agent at heellis@auroragov.org and Andrea Long, Project Manager, at along@auroragov.org. Questions will be answered via addendum posted to online. A pre-bid conference: In the event that this link does not work, interested firms shall email Heidi Ellis, Senior Procurement Agent at heellis@auroragov.org and provide email address to be invited to the Pre-Bid Conference Teams Meeting. The Contract Documents require that all work be Substantially Complete Three (3) Months after Notice to Proceed (NTP) is issued, with Final Completion Four (4) Months after Notice of Proceed (NTP). Failure to complete the work as prescribed shall be considered as a Breach of Contract and subject to Liquidated Damages which are $1,300.00 per day. Bonding Requirements - Bid Bond 5 % Each Bid shall be accompanied by an appropriate guarantee in the form of a Bid Bond made payable to the City of Aurora in an amount of not less than five percent (5%) of the amount of the Bid. In addition, the bid guarantee shall be accompanied in the same file as the bid. The estimated cost for this project is from $475,000.00 to $530,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Award
Water / Sewer
$503,000.00
Public - City
Demolition, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 31, 2025
August 18, 2025
E Smith Rd, Aurora, CO
Related To This Project
Aurora, CO
Bid Date: Aug 05 2025
Aurora, CO
Bid Date: Jul 11 2025
Aurora, CO
Bid Date: Jul 31 2025
Aurora, CO
Bid Date: Oct 13 2025
Aurora, CO
Bid Date: Jul 14 2025
Aurora, CO
Bid Date: Jul 28 2025
Aurora, CO
Bid Date: Aug 01 2025
Aurora, CO
Bid Date: Aug 01 2025
Aurora, CO
Bid Date: Jul 17 2025
Aurora, CO
Bid Date: Jul 16 2025
Aurora, CO
Bid Date: Jul 16 2025
Aurora, CO
Bid Date: Jul 22 2025
Aurora, CO
Bid Date: Jul 01 2025
Aurora, CO
Bid Date: Jul 18 2025
Aurora, CO
Bid Date: Oct 15 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
