Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 4, 2025 at 8:00 PM
Updated July 5, 2025
This is a service / maintenance or supply contract in Collingwood, Ontario. Contact the soliciting agency for additional information.
Question Deadline 07/28/2025 at 2:00 PM ET This Request for Proposals is an invitation by the Town of Collingwood to prospective Respondents to submit proposals for the provision of Engineering Services for a New Raw Water Intake at the Raymond A. Barker Water Treatment Plant Environmental Assessment. The Raymond A. Barker (RAB) Water Treatment Plant (WTP) is located at 2 Raglan Street, Collingwood, Ontario, with an existing rated capacity of 31.14 megalitres per day (ML/d). Surface water is drawn from the Nottawasaga Bay through a submerged inlet structure, located approximately 765m offshore and then conveyed by gravity to the WTP through a 1,067mm diameter reinforced concrete pipe. The existing intake structure was commissioned in 1969. The intake also consists of chlorine, air, and sampling lines which are not currently in service. The existing plant is currently under construction to upgrade and increase the rated capacity to a Phase 1 expansion of 69 ML/d with accommodations being made for a future Phase 2 upgrade and a rated capacity of 101 ML/d. Recent operational challenges, including frazil ice formation, raw turbidity spikes, and increasing draw velocity under peak conditions, have elevated the urgency to implement a secondary raw water intake system. These issues, compounded by growth-driven demand across Collingwood and its regional water-sharing municipalities, present both a capacity risk and a redundancy concern. As such, the Town of Collingwood is initiating a Class Environmental Assessment (Schedule B) and associated engineering services for the planning and conceptual design for a new raw water intake pipe. The new intake will operate to provide the full capacity for the future Phase 2 rated capacity of 101 ML/d (intake capacity will need to be 134 ML/d) as the main supply for the plant with the existing intake serving as partial redundancy.
Conceptual
Water / Sewer
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
