BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 1, 2025 at 8:00 PM

Updated August 2, 2025

Site work and paving for a mixed-use development in Manitou Springs, Colorado. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Reference Number 0000392154 MTF M850-031 (24000) The City of Manitou Springs has advertised for construction Creekwalk Trail 4 along Manitou Ave. (US24E) within CDOT ROW for construction under CDOT Federal Grant funds. The project will remove and replace the sidewalk on the Northside of Manitou Ave. from Mayfair Ave. to Old Man's Trail with a concrete 10' Multi-modal trail with bulb outs, landscaping (irrigation), erosion control, drainage, removal of trees, drainage, and a set of timber stairs on the Westend to connect to the Creekwalk trail next to Fountain Creek. Creekwalk Trail 4 is a continuation of the Creekwalk Trail system that extends to the East. The City of Manitou Springs is seeking qualifications from qualified professional engineering firms who can support construction management, inspection and material testing services for transportation related professional services involving the construction of Creekwalk Trail and to otherwise assist the City in completing the Creekwalk Trail improvement projects. The project will be out to bid July 8th. Construction is expected to begin Sept. 2nd through end of October, 2025. The Contractor is allowed to work Monday through Thursday 7am to 7pm and Friday 7am-3pm. Weekend work is not expected but may be required. Traffic Control will be set up during the weekends and evenings. The City will have an owner's representative available for coordination with Engineer of Record JR Engineering and the City Engineer/Public Works Director Ben Schmitt. Email Krowe@manitouspringco.gov or Bschmitt@manitouspringsco.gov if bidnet is down. The City does not accept the proposals submitted by email. It should be through bidnet. Question Deadline 07/22/2025 at 4:00 PM MT Questions are submitted online Yes, The City will only accept questions through online. No verbal questions or questions through any other means other than online and the virtual preconstruction meeting will be accepted. Buyer Preferences, Guidelines & Requirements Participation Requirements - Disadvantaged Business Enterprise (DBE) - Minority Business Participation - Native American Participation - Small Business Participation - Women-Owned Business Participation General Requirements - Certified Payroll - Insurance Required - Prevailing Wage Required Bonding Requirements - Performance Bond 50 % - Payment Bond 100 % MBE (10.9%), WBE (6.9%), DBE (0%)

Post-Bid

Sidewalks / Parking Lot

$600,000.00

Public - City

Paving, Site Work

57

5

3

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
151
Active Projects
74
Bidding Soon
1,014
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2025

September 2, 2025

Project location map

Manitou Ave, Manitou Springs, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.