BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 1, 2025 at 8:00 PM

Updated August 2, 2025

Renovation of a clubhouse / community center in Eastvale, California. Working plans call for the renovation of a clubhouse / community center.

**As of August 01, 2025, the project received no bids. No definite date for the rebid.** JCSD is soliciting proposals from qualified contractors to remove existing game court striping and re-stripe the gymnasium floor at the Eastvale Community Center, located at 13820 Schleisman road, Eastvale, CA 92880. The project includes the complete removal of all existing court lines and the precise re-striping of two (2) full-size basketball courts, three (3) volleyball courts, and integrated badminton court lines within the volleyball court layout. The gymnasium floor is a Mondo(R) synthetic sports flooring system. Contractors must have proven experience working with this type of surface and use compatible materials to prevent damage and ensure durability. The selected contractor shall remove all existing painted or taped striping from the Mondo(R) synthetic sports flooring at the Eastvale Community Center gymnasium. Removal must be performed with care to avoid damaging the flooring surface. Once the existing striping is removed and the surface is properly cleaned, the contractor shall install new striping as follows: o Two (2) full-size basketball courts (blue lines). o Three (3) volleyball courts, including both center and side court configurations (white lines). o Badminton court lines integrated within the volleyball court footprint (green lines, clearly distinguishable from volleyball lines). o All striping must conform to current NFHS regulations and be verified with JSCD prior to application. Only materials specifically designed for compatibility with Mondo(R) synthetic sports flooring shall be used. o A final walkthrough and inspection will be conducted by a District representative. Any touch-ups or corrections identified during the walkthrough must be completed within the original project timeline. Note: All work must take place between August 25-31, 2024, and must be fully completed by 3:00 p.m. on August 31, 2025. No extensions or exceptions will be granted beyond this timeframe. Written Questions from Bidders Due July 21, 2025 at 5:00 p.m. Award of Contract August 2025

Final Planning

Clubhouse / Community Centers

$400,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
155
Active Projects
1
Bidding Soon
1,846
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2025

February 2, 2026

Project location map

13820 Schleisman Rd, Eastvale, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.