BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2025 at 8:00 PM

Updated August 9, 2025

Site work for a water / sewer project in Springfield, Oregon. Completed plans call for site work for a water / sewer project.

**As of August 8th,2025, the project was awarded to Knife River Corporation, with an awarded amount of $228,919.50.** Purchase and delivery of an estimated 1,395 tons of Slow Sand Filter Media with the delivery beginning not sooner than September 15th, 2025 and ending no later than October 17th, 2025. The filter media delivered to the Owner's slow sand filter site will meet NSF 61 standards and be tested pursuant to the specification for turbidity, uniformity coefficient, effective size, percentage of fines, etc. and must meet the specified standards. No proposal will be considered by the Springfield Utility Board unless the Bid contains a statement by the Bidder that the Bidder will comply with the provisions of ORS 279C.800 to 279C.870 and 40 U.S.C. 276(a) pertaining to prevailing wages, as applicable. Contractor licensing under ORS 468A.720 for working with asbestos-containing materials is not a requirement of this project. Each bid must contain a statement as to whether or not the bidder is a resident bidder as defined in ORS 279A.120. Each bid must also contain a statement as to whether the bidder is registered with the Oregon Construction Contractors Board. No bid will be received or considered unless the bidder is registered with the Construction Contractors Board, as required by ORS 701.035 et seq. The Springfield Utility Board reserves the right to reject any and all bids, to waive any irregularities, and to accept the bid deemed in the best interests of the Springfield Utility Board. The Springfield Utility Board may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids upon a finding of the agency it is in the public interest to do so. For technical questions, contact David Looney at 541-556-4554 or email at davidl@subutil.com or David Embleton at 541-744-3730 or email at davide@subutil.com. If any other issues arise, please contact Rebecca Wheeler at 541-744-3756 or by email at rebeccaw@subutil.com.

Award

Water / Sewer

$228,920.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
17
Bidding Soon
324
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 5, 2025

September 15, 2025

Project location map

202 South 18th Street, Springfield, OR

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.