Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 22, 2025 at 8:00 PM
Updated August 23, 2025
Site work for a water / sewer project in Springfield, Oregon. Completed plans call for site work for a water / sewer project.
Springfield Utility Board (SUB) seeks a contractor to install underground facilities consisting of three runs of three inch schedule 40 conduit and one 4x4 concrete vault with lid. Work will include, but not limited to, installing approximately 300 feet of conduit and one 4x4 concrete vault with lid in the area of North 17th Street and Main Street in Springfield OR 1. Install one 4x4 concrete term-a-duct vault, number 25C017, with lid in the planting strip between parking lot entrances. 2. Cut and trench across 17th street and sidewalks from SUB pole 84091 to new vault 25C017, install two runs of 3 inch schedule 40 conduit, about 50 feet, with 90 degree elbows to turn north towards vault. Stub up at base of pole, make connection at vault. Repair concrete and asphalt, CDF if city required. 3. Cut and repair parking lot entrance, trench and install roughly 50 feet of 3 inch conduit from the new vault headed north. At the north east corner of the parking lot install one 3 foot, 90 degree elbow with bell end and an above grade junction box. 4. Cut and trench across parking lot entrance, install two runs of 3 inch conduit from vault 25C017 south. First run turns west to the building, remove concrete walk way pad, install one run of 3 inch conduit with 90 degree elbow and stub up at building, about 80 feet. Second run goes straight from vault 25C017 to south property line, about 80 feet. Cap and bury. Work to be completed by August 29st 2025 or sooner. If this completion date could not be met, please provide a proposed completion date on bid form. Bid Questions: Sandi Weston 541-744-3706 Office sandiw@subutil.com The Bidder acknowledges the right of SUB to reject all bids and to waive any informality or irregularity in any bid received. In addition, the Bidder recognizes the right of SUB to reject a bid if the Bidder failed to furnish the data required by the Bidding Documents, or if the bid is in any way incomplete or irregular. SUB may reject, for good cause, any or all bids upon a finding of SUB that it is in the public interest to do so.
Bid Results
Water / Sewer
$20,538.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 20, 2025
August 21, 2025
N 17th St, Springfield, OR
Related To This Project
Springfield, OR
Bid Date: Aug 28 2025
Springfield, OR
Bid Date: Sep 04 2025
Springfield, OR
Bid Date: Aug 21 2025
Springfield, OR
Bid Date: Oct 01 2019
Springfield, OR
--
Springfield, OR
Bid Date: Sep 17 2025
Springfield, OR
Bid Date: Sep 16 2025
Springfield, OR
--
Springfield, OR
Bid Date: Aug 27 2025
Springfield, OR
Bid Date: Aug 27 2025
Springfield, OR
Bid Date: Aug 07 2025
Springfield, OR
Bid Date: Jul 30 2025
Springfield, OR
Bid Date: Aug 05 2025
Springfield, OR
Bid Date: Jun 30 2020
Springfield, OR
Bid Date: Aug 20 2020
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
