Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 15, 2025 at 8:00 PM
Updated September 27, 2025
Renovation of an educational facility in Concord, California. Completed plans call for the renovation of a educational facility.
2025 MDUSD Dent Center Technology Infrastructure Upgrade The Project consists of interior painting of common spaces and corridors. To bid on this Project, the Bidder is required to possess one or more of the following State of California Contractor Licenses: B and/or C-10. The Bidder's license(s) must be active and in good standing at the time of the bid opening and must remain so throughout the term of the Contract. Question Deadline 07/29/2025 at 3:00 PM PT All questions about the meaning or intent of the Contract Documents are to be directed in writing to the District representative, Mike Torres via email at mike.torres@6dpmcm.com. SCOPE A. The work will include but not be limited to the following objectives: 1. Contractor shall furnish and install all required components and accessories as outlined in the design documents for a complete and operable turn-key system. 2. Quality workmanship is a high priority for the District and the Contractor shall be held to a high-level of professional workmanship. Contractors unfamiliar with the Districts standards shall familiarize themselves with the standards and requirements prior to beginning work. 3. The Contractor shall furnish and install fire-treated (three quarter inch) plywood for the MDF room (all walls, from floor level to 8 high) and IDF locations (as required or indicated in the design documents). 4. The Contractor shall furnish and install a ground bus bar at the MDF and IDF rooms. 5. The Contractor shall furnish and install all required racks and cabinets. 6. The Contractor shall install owner-provided uninterruptable power supply(ies) (UPS) for the MDF and/or IDF racks. 7. The Contractor shall furnish and install all newly required conduit/raceway. 8. The Contractor shall furnish and install all wire/cable (copper/fiber optic) as required. 9. The Contractor shall terminate all strands of fiber at each fiber enclosure. 10. The Contractor shall furnish and install termination all end-point equipment (patch panels, jacks, wallplates, enclosures, etc.). 11. The Contractor shall furnish and install all patch cords (copper/fiber). 12. The Contractor shall test and certify (for warranty) the installed cable plant
Award
Educational
$1,943,586.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 5, 2025
November 11, 2025
1936 Carlotta Dr, Concord, CA
Related To This Project
Concord, CA
Bid Date: Aug 14 2025
Concord, CA
--
Concord, CA
Bid Date: Aug 21 2025
Concord, CA
Bid Date: Sep 02 2025
Concord, CA
Bid Date: Sep 16 2025
Concord, CA
Bid Date: Sep 04 2025
Concord, CA
Bid Date: Jan 20 2026
Concord, CA
Bid Date: Dec 04 2025
Concord, CA
Bid Date: Jul 31 2025
Concord, CA
Bid Date: Jul 10 2025
Concord, CA
Bid Date: Jun 19 2025
Concord, CA
Bid Date: May 29 2025
Concord, CA
Bid Date: Jun 19 2025
Concord, CA
Bid Date: Jun 24 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
