BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 13, 2025 at 7:00 PM

Updated December 16, 2025

Site work, paving and outdoor lighting for a mixed-use development in Fountain Hills, Arizona. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Shea Boulevard Widening Project between Palisades Boulevard and Fountain Hills Boulevard involves expanding the south side of Shea Boulevard to accommodate an additional eastbound lane. The project will generally include earthwork, asphalt paving, concrete flatwork, drainage improvements, erosion protection (which may include retaining walls), pavement striping, signage, landscaping, and other necessary incidental work. Work shall be constructed in accordance with MAG & ADOT Details and Specifications. This project is part of the Arterial Life Cycle Program (ALCP) maintained by the Maricopa Association of Governments (MAG) and is partially funded by the Proposition 400 program. Bid Bond. All Vendors desiring to prepare a responsive Bid shall submit a non-revocable bid security payable to the Town in the amount of ten percent (10%) of the total Bid Price. Performance Bond. The Contractor shall be required to furnish non-revocable security binding the Contractor to provide faithful performance of this Contract in the amount of one hundred percent (100%) of the total Contract Price payable to the Town. Payment Bond. The Contractor shall be required to furnish non-revocable security for the protection of all persons supplying labor and material to the Contractor or any Subcontractor for the performance of any Work related to this Contract. Payment security shall be in the amount of one hundred percent (100%) of the total Contract Price and be payable to the Town. Question Deadline 10/16/2025 at 5:00 PM MT. Questions shall be submitted through online. Any questions concerning traffic signals or to arrange for an inspection, contact Justin Weldy with the Town at (480) 816-5133. Inspections must be scheduled a minimum of 48-hours (or 2 business days) in advance. Town reserves all rights inclusive of, but not limited to, the right to purchase material and/or to complete the Work and to recover any actual excess costs associated with such completion from the Contractor.

Award

Roads / Highways

$2,629,658.00

Public - City

Outdoor Lighting, Paving, Site Work

54

36

85

7

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
0
Bidding Soon
621
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 3, 2025

December 31, 2025

Project location map

E Shea Blvd, Fountain Hills, AZ

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.