BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 29, 2025 at 8:00 PM

Updated September 30, 2025

Site work and paving for a road / highway in Pueblo West, Colorado. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Reference Number 0000392973 Bid Intent Not Available The Pueblo West Metropolitan District ("District") is soliciting competitive bids from qualified and interested Contractors for the repair of The Coyote Trail. This project consists of approximately 1350 SY of Damaged Asphalt Trail Repair, 3,900 SY of Fine Grading and 240 LF of Re-Establishment of Roadside Swale work. As shown in map in Appendix "A". All work will be accomplished utilizing CDOT Standard Specification 2023. The repair project consists of existing asphalt removal and disposal, base course removal and disposal (limited areas), base course replacement, subgrade preparation (limited areas), Hot Mixed Asphalt and revegetation of disturbed areas. Asphalt area to be repaired shall be saw cut to achieve a straight perpendicular edge, the existing damaged asphalt pavement material shall be removed to 3-inches below asphalt finished grade, in areas that the failure has caused subgrade damages the existing base course shall be removed, Class 6 base course shall be placed and compacted per the standard specification included herein prior to placement of Hot Mixed Asphalt. Existing vertical surfaces shall be prepped with "Tack Oil". 95% of the patched surface shall match the plane of the adjacent undisturbed surface, when measured by means of a six-foot straightedge or beam, within one-eighth of inch. Some areas will require fine grading to facilitate stormwater flows. If any additional material is required to provide positive flow the material will be provided by PWMD. The roadside swale along the south edge of Spaulding Ave. will need to be re-established to accommodate stormwater flows . All disturbed areas will be stabilized by the application of fertilizers, soil amendment, seed bed preparation and placing of seed. All permits will be the responsibility of the Contractor. Material testing to be provided by the District. Contract time: 30 Calendar Days A 5% Bid Bond must accompany each bid received. A Performance Bond, Labor and Materials Payment Bond and Certificates of Insurance (coverage in accordance with the contract documents) will be required of the successful bidder. Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % Question Deadline 07/31/2025 at 5:00 PM MT Questions are submitted online No

Award

Roads / Highways

$65,013.00

Public - City

Paving, Site Work

3

4

2

8

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
10
Bidding Soon
317
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 14, 2025

September 15, 2025

Project location map

To Be Determined, Pueblo West, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.