BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2025 at 7:00 PM

Updated November 13, 2025

Site work and paving for a mixed-use development in Pueblo West, Colorado. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of November 7th, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Reference Number 0000398875 Bid Intent Not Available The Pueblo West Metropolitan District is currently soliciting competitive bids for a Multi-Modal Trail project. We are seeking qualified and interested contractors to construct approximately 1345 lineal feet of a 8-foot concrete trail. This comprehensive project will include all necessary pavement markings, minor grading, fence replacement, sprinkler repair and relocation and traffic control to ensure a safe and complete installation. This work includes all labor, materials, and equipment necessary for the complete construction of the items described above and as specified in the Plans and Specifications. Pricing shall be all inclusive to include but not be limited to all labor, equipment, supplies, materials, freight, travel, fuel, set-up and take-down cost, and all other costs related to the successful completion of the project. Project Site Location: Location or address of construction office: Project is located in Pueblo West, Colorado, beginning approximately 930 feet southeast of the intersection of McCullouch Boulevard and South Joe Martinez Boulevard extending into Civic Center Drive and Civic Center Park. Contract time: 90 Calendar Days Question Deadline 10/08/2025 at 2:00 PM MT Questions are submitted online No - All written questions, clarifications or requests regarding this IFB shall be submitted by email to Michael Winters, Procurement Manager at Purchasing@pueblowestmetro.us Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Insurance Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Labor and Materials Bond 100 % A 5% Bid Bond must accompany each bid received. A Performance Bond, Labor and Materials Payment Bond and Certificates of Insurance (coverage in accordance with the contract documents) will be required of the successful bidder. MBE (27.5%), WBE (6.9%)

Bid Results

Sidewalks / Parking Lot

$199,280.00

Public - City

Paving, Site Work

26

6

2

6

Subscribe For Documents

74 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
37
Bidding Soon
326
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 20, 2025

November 19, 2025

Project location map

McCulloch Blvd & S Joe Martinez Blvd, Pueblo West, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.