Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published December 15, 2025 at 7:00 PM
Updated December 16, 2025
Site work and paving for a sidewalk / parking lot in Issaquah, Washington. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
Synopsis: This project provides improvement of a shared use path, from SE Kent Kangley Road to the Black Diamond Open Space in Maple Valley and unincorporated King County. This project includes Schedule A (shared use path) and Schedule B (Covington Water District water main relocation.) Schedule A includes construction of approximately 1.7 miles of gravel trail, clearing and grubbing, erosion control, site preparation, grading, traffic control, utility adjustments/relocation, curb and gutter, roadway channelization striping, relocation of an existing fire hydrant, signal equipment replacement, a pedestrian pre-fabricated bridge over the BNSF Railway, and landscape restoration. Schedule B includes approximately 154 LF of a 12-inch water main replacement for Covington Water District. Engineer's Estimate: $7,180,000 Work site: SE Kent Kangley Road to the Black Diamond Open Space Subcontracting Opportunities: Earthwork (Clearing and Grubbing, Excavation and Embankment, Haul, Removal); Bases, Ballast and Crushed Surfacing; Surface Treatments and Pavement (HMA, Cement Concrete Pavement); Structures (Concrete Structures, Steel Structures, Bridge Railings); Drainage Structures, Storm Sewers, Water Mains and Conduits; Drainage Structures, Storm Sewers, Water Mains and Conduits; Apprenticeship Requirements: 15% minimum Apprentice Utilization Requirement. Request for Information: Submit all inquiries via email to the Contract Specialist and cc the Alternate Contract Specialist. No verbal answers by any County personnel or its agents and consultants will be binding on the County. Buyer (Contract Specialist): Kelly McKeever, kelly.mckeever@kingcounty.gov, 206-263-9389 Alternate Buyer (Alternate Contract Specialist): Mark Hoge, mark.hoge@kingcounty.gov, 206-263-9325 SCS Utilization Requirements: 15% minimum requirement for King County Certified Small Contractors and Suppliers (SCS) Priority Hire Apprentice Utilization Requirement: 27% of the total Apprentice Labor Hours worked during the contract. Priority Hire Journey Level Requirement: 17% of the total Journey Labor Hours worked during the contract.
Bid Results
Sidewalks / Parking Lot
$6,123,123.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 11, 2025
February 11, 2026
Multiple Locations, Issaquah, WA
Related To This Project
Issaquah, WA
--
Issaquah, WA
Bid Date: Aug 26 2025
Issaquah, WA
Bid Date: Sep 08 2025
Issaquah, WA
--
Issaquah, WA
Bid Date: Oct 22 2025
Issaquah, WA
--
Issaquah, WA
Bid Date: Jul 31 2025
Issaquah, WA
Bid Date: Jul 10 2025
Issaquah, WA
Bid Date: Jun 11 2025
Issaquah, WA
Bid Date: May 19 2025
Issaquah, WA
Bid Date: Apr 30 2025
Issaquah, WA
Bid Date: Jun 12 2025
Issaquah, WA
Bid Date: Apr 17 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
