Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 28, 2025 at 8:00 PM
Updated October 8, 2025
This is a service / maintenance or supply contract in Seatac, Washington. Contact the soliciting agency for additional information.
The Port of Seattle is conducting an informational meeting to interested proposers to explain the scope of work and project requirements associated with the future Concourse B, C, D - HVAC Infrastructure Renewal/Replacement Project (CHIRRP)- GC/CM at the Sea-Tac International Airport. The Port of Seattle is not responsible for any costs incurred for attending this Informational Meeting. Informational Meeting for Port of Seattle MC-0322388 - Concourse B, C, D - HVAC Infrastructure Renewal/Replacement Project (CHIRRP) - GC/CM Scope of Work The Port of Seattle will be accepting proposals to provide GC/CM services for the Concourse B, C, D - HVAC Infrastructure Renewal/Replacement Project (CHIRRP. The Port intends to award a General Contractor/Construction Manager contract utilizing a competitive negotiation process authorized by 39.11.350. The primary focus of the Concourse HVAC Infrastructure Renewal and Replacement Program (CHIRRP) is the renewal and replacement of the existing heating, ventilation, and air conditioning (HVAC) systems and the addition of smoke control or management systems within Concourses B, C, and D. The project scope will include replacement or refurbishment of rooftop air handing equipment and associated penthouses, removal of ramp level air handling equipment including re-routing associated mechanical ducting, addition of smoke control and or smoke management infrastructure and systems, structural modifications, and emergency power upgrades. This project also includes replacing the ceiling, lighting and fire sprinklers in the concourses. The estimated completion date for the project is 3rd Quarter 2034. The RFP for the GC/CM is anticipated to be issued August 12, 2025. Question Deadline 09/24/2025 at 5:30 AM PT
Post-Bid
Transportation Terminals
$215,000,000.00
Public - State/Provincial
Service, Maintenance and Supply
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
22
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 7, 2025
November 24, 2025
17801 International Blvd, Seatac, WA
Related To This Project
Seatac, WA
--
Seatac, WA
Bid Date: Sep 11 2025
Seatac, WA
Bid Date: Oct 07 2025
Seatac, WA
Bid Date: Aug 22 2025
Seatac, WA
Bid Date: Oct 15 2025
Seatac, WA
Bid Date: Oct 02 2025
Seatac, WA
Bid Date: Nov 18 2025
Seatac, WA
Bid Date: Aug 07 2025
Seatac, WA
Bid Date: Aug 11 2025
Seatac, WA
--
Seatac, WA
Bid Date: Jul 24 2025
Seatac, WA
Bid Date: Jun 24 2025
Seatac, WA
Bid Date: Jun 12 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
