BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2025 at 8:00 PM

Updated October 8, 2025

This is a service / maintenance or supply contract in Seatac, Washington. Contact the soliciting agency for additional information.

The Port of Seattle is conducting an informational meeting to interested proposers to explain the scope of work and project requirements associated with the future Concourse B, C, D - HVAC Infrastructure Renewal/Replacement Project (CHIRRP)- GC/CM at the Sea-Tac International Airport. The Port of Seattle is not responsible for any costs incurred for attending this Informational Meeting. Informational Meeting for Port of Seattle MC-0322388 - Concourse B, C, D - HVAC Infrastructure Renewal/Replacement Project (CHIRRP) - GC/CM Scope of Work The Port of Seattle will be accepting proposals to provide GC/CM services for the Concourse B, C, D - HVAC Infrastructure Renewal/Replacement Project (CHIRRP. The Port intends to award a General Contractor/Construction Manager contract utilizing a competitive negotiation process authorized by 39.11.350. The primary focus of the Concourse HVAC Infrastructure Renewal and Replacement Program (CHIRRP) is the renewal and replacement of the existing heating, ventilation, and air conditioning (HVAC) systems and the addition of smoke control or management systems within Concourses B, C, and D. The project scope will include replacement or refurbishment of rooftop air handing equipment and associated penthouses, removal of ramp level air handling equipment including re-routing associated mechanical ducting, addition of smoke control and or smoke management infrastructure and systems, structural modifications, and emergency power upgrades. This project also includes replacing the ceiling, lighting and fire sprinklers in the concourses. The estimated completion date for the project is 3rd Quarter 2034. The RFP for the GC/CM is anticipated to be issued August 12, 2025. Question Deadline 09/24/2025 at 5:30 AM PT

Post-Bid

Transportation Terminals

$215,000,000.00

Public - State/Provincial

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

22

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
188
Active Projects
89
Bidding Soon
1,730
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 7, 2025

November 24, 2025

Project location map

17801 International Blvd, Seatac, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.