BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 25, 2025 at 8:00 PM

Updated August 26, 2025

Site work and paving for a mixed-use development in Florence, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

Question Deadline 08/08/2025 All inquiries relating to this request shall be addressed to: City of Florence Attn: City Clerk 600 West Third Street Florence, Colorado 81226 cortlyne.huppe@florencecolorado.org. The City of Florence, Colorado, is requesting bids from a qualified person, firm, or corporation for construction of sidewalk, curb and gutter, and asphalt removal and replacement in the 700 - 800 Block of W. 1st St. DESCRIPTION OF BID: 700 800 Block of W. 1st St. Cold plane and Overlay The City of Florence will accept sealed bids for the following general scope of work for completion prior to October 17, 2025. No bid bond is required. 100% performance and payment bonds are required. Bid Schedule A and A&B are to be bid. If both schedules are not bid the bid will be subject to rejection. City Council will decide to which contractor they would like to award said project to. Bid Schedule A and A&B are to be bid. If both schedules are not bid the bid will be subject to rejection. City Council will decide to which contractor they would like to award said project to. This project will re-construct curb and gutters in various places, a complete mill with overlay. The work generally includes removal of existing curb sections, cold plane of the total length and width and replace. Any questions concerning bids shall be directed to the City Clerk Cortlyne Huppe at email address cortlyne.huppe@florencecolorado.org. measuring, accessories, components, traffic control, safety barriers, equipment, tools, labor, other necessary items, disposal of related debris, and cleanup services needed to construct the 700 - 800 Block of W. 1st St. as outlined in the Bid Schedule, within the City of Florence. The work generally includes: A. On the Northside and Southside the cold plane will be 2" - 0" - 8' wide from curb pan toward the center of road. B. Excavate and remove then replace existing curb and gutter where marked. Contractor may haul spoils material to dump site at the Union Highland Cemetery or other site the contractor has acquired. C. Backfill excavated area with Class 6 aggregate base material and compact to minimum 95% Standard Proctor density at near optimum moisture content. No concrete shall be placed until City has verified compaction with ground probe. All excavation, backfill, and compaction shall meet the requirements of the City of Florence Street Standards. D. 2 inches of asphalt but across the full project area. E. Place 6" Schedule 40 pipe to connect laterals. F. Leveling Course where needed.

Award

Sidewalks / Parking Lot

$109,253.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
17
Active Projects
0
Bidding Soon
238
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2025

August 20, 2025

Project location map

800 W 1st St, Florence, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.