Updated September 23, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Omega, Georgia. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

**As of September 22, 2025, the project was awarded to Southern Concrete Construction Company Inc, with an awarded amount of $1,766,757.58** The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Omega Eldorado Road Bridge Replacement Over Little River as shown on the construction drawings. In general, construction consists of removal of existing bridge and drainage structures; and installation of a new 32 wide, 260 foot long bridge structure utilizing pre-stressed concrete slabs, PSC pilings, approach slabs, base and paving construction, grading, striping, guard rails, erosion control, grassing and all other associated appurtenances required for a complete project, as outlined in the construction drawings and specifications. This work will be awarded in one (1) contract with a 120 consecutive calendar day construction schedule. All bid forms must be accompanied by a Bid Bond in an amount not less than ten percent (10%) of the amount bid. The successful bidder, if awarded the Contract, will be required to furnish a Performance Bond of one hundred percent (100%) of the Contract amount and Payment Bond in the amount of one hundred ten percent (110%) of the Contract amount. Docs notes : rospective Bidders may examine the Bidding Documents at the Tift County Board of Commissioners, located at Charles Kent Administration Building, Room 204, 225 North Tift Avenue, Tifton, GA 31794 or at Watkins & Associates, LLC on Mondays through Fridays between the hours of 8 A.M. and 5 P.M. Upon request and receipt of the document payment indicated above, Watkins & Associates, LLC will transmit the Bidding Documents via delivery service. The Owner, reserves the right to reject any or all bids, to waive informalities, and to readvertise. Question Deadline 08/15/2025: All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing. . Questions received less than ten days prior to the date for opening of Bids may not be answered.

Award

Bridges / Tunnels

$1,766,758.00

Public - County

Demolition, New Construction, Paving, Site Work

32

18

2

3

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
95
Active Projects
50
Bidding Soon
587
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 28, 2025

September 25, 2025

Project location map

Omega-Eldorado Rd, Omega, GA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.