BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 25, 2025 at 8:00 PM

Updated August 26, 2025

Renovation of a power facility in Boulder City, Nevada. Completed plans call for the renovation of a power facility.

This requirement includes the furnishing and installing 240 sq ft of new vinyl composition floor tiles, 1/8-inch thickness, 12 inches by 12 inches with two coats of sealer. Color selection of floor tiles shall match existing floor tiles color. Contracting office: Western-Desert Soutwest Region WAPA (DSW) US DOE/Western Area Power Desert Southwest Regional Office 615 S. 43rd Avenue Phoenix, AZ 85009 Question Deadline 08/01/2025 at 4:30 PM PT Any questions concerning this solicitation MUST be submitted in writing and received in the contracting office The bid was awarded to System Solution Strategies LLC

Award

Power Plant

$4,150.00

Public - State/Provincial

Renovation

3

3

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
20
Bidding Soon
384
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 12, 2025

September 11, 2025

Project location map

2051 Buchanan Blvd, Boulder City, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.