Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 29, 2025 at 8:00 PM

Updated October 30, 2025

Site work for a water / sewer project in Summerville, Georgia. Completed plans call for site work for a water / sewer project.

The Contractor Shall Furnish All Labor, Equipment and Materials Necessary to Construct the New Gravity Sewer System Components as Shown in the Construction Drawings. More Specifically, the Work Shall Consist of 2,000 Lf of Conventional Sanitary Sewer With Pvc Mains Ranging From 10 to 8, 120 Vf of Manhole Construction, 30 Customer Transfers ,000 Lf of Pavement Replacement, Erosion & Sediment Control, Grassing and All Other Appurtenances Necessary for a Complete Installation. Award of Contract: September 8th, 2025 Pre-Construction Conference: Mid-October, 2025 Time allotted for completion of work is 180 consecutive calendar days. All Work shall be completed in accordance with the plans and specifications. Notice to Proceed: NLT December 2nd, 2026 Date of Substantial Completion: NLT May 31st, 2026 Bids shall be accompanied by a bid bond or certified cashiers check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an A minimum rating of performance and a financial strength of at least five (5) times the contract price as listed in the most current publication of Bests Key Rating Guide Property Liability. Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid Question Deadline 08/28/2025 Biddershallsubmit all questions about the meaning or intent of the Bidding Documentsto Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Questions to Engineer may be submitted via Quest Questions received less than seven days prior to the date for opening of Bids may not be answered

Award

Water / Sewer

$754,015.00

Public - City

Site Work

15

16

7

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 4, 2025

October 6, 2025

Project location map

Multiple Locations, Summerville, GA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed