Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 15, 2025 at 8:00 PM
Updated August 16, 2025
Site work for a municipal facility in Riverton, Utah. Completed plans call for site work for a municipal facility.
This quote is for additional concrete at the animal shelter. Two pads are needed and a mow strip under some fencing. The specification and a total quantity that includes both pads are as follows: 1,400 sqft at 6" thick - 4500 PSI concrete with 6x6 wire mesh, sawcut joints. The specification and quantity for the mow strip is as follows: 38 sqft @ 6" thick (this is calculated at 57 LF at 8" wide). The City will do the grading and the base course on the pads. Contractor will need to work with the City on setting the grade and base. Inquiries Sent To: Craig Calvert E-Mail: Remit Address: E-Mail: ccalvert@rivertonutah.gov Phone: 801-208-3175 Date Sent: 7/29/2025. Riverton City reserves the right to approve or reject any subcontractor. The City will not provide drawings, bidder's lists, etc. to subcontractors or suppliers.
Award
Municipal
$16,552.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 4, 2025
August 7, 2025
To Be Determined, Riverton, UT
Related To This Project
Riverton, UT
Bid Date: Aug 21 2025
Riverton, UT
Bid Date: Sep 04 2025
Riverton, UT
Bid Date: Sep 08 2025
Riverton, UT
Bid Date: Sep 09 2025
Riverton, UT
Bid Date: Sep 15 2025
Riverton, UT
Bid Date: Sep 18 2025
Riverton, UT
Bid Date: Sep 22 2025
Riverton, UT
Bid Date: Oct 21 2025
Riverton, UT
Bid Date: Jul 31 2025
Riverton, UT
Bid Date: Jul 28 2025
Riverton, UT
Bid Date: Jul 29 2025
Riverton, UT
Bid Date: Jul 23 2025
Riverton, UT
Bid Date: Jul 03 2025
Riverton, UT
Bid Date: Jul 17 2025
Riverton, UT
Bid Date: Jul 17 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
