Published September 19, 2025 at 8:00 PM

Updated September 20, 2025

Site work and outdoor lighting for a road / highway in Riverton, Utah. Completed plans call for site work for a road / highway.

Quote for Refurbishing 45 Street Lights at the following locations: - Monarch Meadows Pkwy (13400 south to Morning Cloak) 11-14' streetlights 6-12' streetlights -4570 west (12600 south to 12990 south) 17-14' streetlights - Market Center Dr. (13250 south to 13400 south) 11-14' streetlights. Refurbish, meaning sandblast and paint an existing pole, banner arm and fixture head and all streetlight components. Sandblasting will be done to the SSPC-SP-10 Near White Metal Blast Standards and then paint using an application of an epoxy primer that has a minimum of 50% solids +/- 2%, and a top coat application of an acrylic-aliphatic urethane. Paint color is to be black paint, semi gloss #PPG95-8500black. Paint could be brushed or sprayed. Paint thickness is: 4 to 5 mils DFT on the epoxy primer. 2 to 3 mils DFT on the urethane top coat. Contractor is to refurbish on-location, without removing the pole, or off-location by removing the pole, taking to contractors booth, refurbishing and reinstalling within 48 hours. Bidders should know that the last time we had a contractor refurbish street lights the contractor could not remove the poles because the bolts were rusted to the pole. If bidding to remove and refurbish off-location, a licensed electrician must do the disconnect and re-connect. Poles are to be removed such that every other pole is left in working condition while those removed are being refurbished, when refurbished and reinstalled the ones that were left may be removed and refurbished. The exposed wiring must be protected from vandalism or exposure to non-qualified individuals. All liability for vandalism or loss will be the contractor's responsibility. The contractor is to coordinate with City Staff on the removal and delivery prior to start. Paint is to be applied during optimal weather conditions. Inquiries Sent To: Craig Calvert Contractor is required to get all permits, and complete the project by April 1, 2026. Riverton City reserves the right to make payments with a credit card. If the prices change because of a credit card payment bidder must provide two prices, a price for payment by credit card and a price for payment by check. Riverton City reserves the right to approve or reject any subcontractor. The City will not provide drawings, bidder's lists, etc. to subcontractors or suppliers.

Award

Roads / Highways

$41,400.00

Public - City

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
59
Bidding Soon
986
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2025

August 22, 2025

Project location map

Multiple Locations, Riverton, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.