Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published November 7, 2025 at 7:00 PM
Updated November 8, 2025
Site work and renovation of a water / sewer project in Riverton, Utah. Completed plans call for site work for a water / sewer project.
Fencing along the Welby Jacob Canal Trail, approximately 600 LF. This quote has two options. Bidders may bid on both options or only one option. See the attached location map. This is for Phase 1 identified on the map. Option 1: Remove the existing 6' tall vinyl fence and re-install an 8' tall vinyl fence. Option 2: Extend the height of the existing 6' tall vinyl fence by adding 2' to it making it an 8' tall vinyl fence. Any changes in quantity, specifications, schedules, opening date, corrections, clarifications, etc. will be in the form of an addendum. Addendums will be in writing, will be distributed to all bidders by the purchasing department and will become part of this bid. Any attempts to alter this bid verbally should be ignored. All bidders must be able to demonstrate that they are responsible, competent contractors with the resources to complete a project of this magnitude and must be prepared to provide documented proof of such upon request including references and financial statements. The contractor's past performance history, organization, equipment and demonstrated ability to perform and complete their contracts in the manner and within the time limit specified will be elements along with the dollar amount of the bid which will be considered by the City in the letting of the contract, if any award is made. The City reserves the right to reject any and all bids by reason of this paragraph. Contractor is required to complete the project by October 30, 2025. The anticipated timeframe, or timeline, is as follows: City will issue a Notice to Proceed within three (3) business days after the due date. Contract time (commencement of work date) begins seven (7) calendar days after the Notice to Proceed Date. Work cannot begin until a pre-construction meeting has been held and the following is submitted to the City Purchasing Department. All Required Permits Proof of Insurance Certificate of employee verification Any damages occurring from the execution of the contract, incidental or otherwise, to City or private properties must be repaired, at the contractor's expense, to the owner's satisfaction. Questions of a technical nature regarding this project or the specifications should be directed to Craig Calvert at 801-208-3175. Bidders must meet all current licensing requirements of the City, County and State of Utah to do the type of work required under this bid including the proper license classifications with a sufficient monetary limit as established and issued by the division of occupational and professional licensing, state department of commerce. Licensing must be current and valid at the date of bid opening. Please provide license number with response. Time is the essence of the Contract Documents. Contractor agrees that the City will suffer damage or financial loss if the project is not completed on the agreed completion time or within any time extensions that are allowed by written pre approval. The Contractor and the City agree that proof of the exact amount of any such damage or loss is difficult to determine. Accordingly, instead of requiring any such proof of damage or specific financial loss or late completion, the Contractor agrees to pay the following sums to the City as liquidated damages and not as a penalty. No land survey monument shall be disturbed or moved until the City Engineer has been properly notified and the City Engineer's surveyor has referenced the survey monument for resetting. The parties agree that upon such an unauthorized disturbance it is difficult to determine the damages from such a disturbance, and the parties agree that Contractor will pay as liquidated damages the sum of one thousand dollars and no cents ($1000.00) to cover such damage and expense. Riverton City reserves the right to make payments with a credit card. If the prices change because of a credit card payment bidder must provide two prices, a price for payment by credit card and a price for payment by check. Riverton City reserves the right to approve or reject any subcontractor. The City will not provide drawings, bidder's lists, etc. to subcontractors or suppliers. In the event of breach, the prevailing party will be entitled to attorneys fees, regardless of whether the issue is brought to court. Riverton City requests assignment of rights to recover damages from any antitrust violations. Questions of a technical nature regarding this project or the specifications should be directed to Craig Calvert at 801-208-3175. Bid Result Option 1: Dirty Boys Contracting $25,000 Option 2: Allied Fence $19,317
Under Construction
Water / Sewer
$25,000.00
Public - City
Renovation, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 9, 2025
October 29, 2025
Welby Jacobs Canal Trail, Riverton, UT
Related To This Project
Riverton, UT
Bid Date: Sep 15 2025
Riverton, UT
Bid Date: Sep 18 2025
Riverton, UT
Bid Date: Sep 22 2025
Riverton, UT
Bid Date: Oct 21 2025
Riverton, UT
Bid Date: Nov 04 2025
Riverton, UT
Bid Date: Dec 02 2025
Riverton, UT
Bid Date: Dec 02 2025
Riverton, UT
--
Riverton, UT
Bid Date: Sep 08 2025
Riverton, UT
Bid Date: Sep 04 2025
Riverton, UT
Bid Date: Aug 21 2025
Riverton, UT
Bid Date: Aug 04 2025
Riverton, UT
Bid Date: Jul 31 2025
Riverton, UT
Bid Date: Jul 28 2025
Riverton, UT
Bid Date: Jul 29 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
