Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 28, 2025 at 8:00 PM
Updated August 29, 2025
Renovation of a municipal facility in Corona, California. Working plans call for the renovation of a municipal facility.
**As of August 28 , 2025 project has been canceled. As of this time it is unknown if an when project will rebid. 91 Express Lanes Toll Plaza Plumbing Project Project Description and Background The Authority is a state-mandated, countywide transportation agency. OCTA was formed in 1991 to develop and implement transportation programs to reduce traffic congestion and improve air quality. As one (1) agency, OCTA provides Orange County with a single point of accountability and a greater voice for residents for all transportation issues. As an important part of OCTA's staff development programs, OCTA is searching for a qualified contractor to perform plumbing repairs at the 91 Express Lanes Toll Plaza. Under the terms of the agreement, the Contractor shall locate approximately 1,250 linear feet "LF" of existing and failed 1" copper water main. The Contractor shall sawcut asphalt where required, remove old copper pipe and replace with new Schedule 80 PVC. Trench must be a minimum of 18" deep to the top of the pipe, backfilled and properly compacted to prevent settling. The Contractor shall remove and replace the existing 1" valve at the mainline tie-in with a new, certified lead-free valve. The Contractor shall also connect to the small employee facility with a sink and toilet at the end of the water main. This facility shall be connected to the new 1" PVC waterline with a transition from PVC to copper, utilizing a 1" Certified lead-free valve and fittings required to make this connection. Asphalt repairs shall be paved to a depth of 4" minimum, properly compacted in a professional and permanent manner, and edges tacked and sealed. If striping is disturbed during this project, either from trenching or other construction damage, it shall be restriped per Caltrans specs. If any of the new water main is in any dirt area outside of the asphalt, this dirt area shall be returned to its natural and existing state. The Contractor will be required to furnish any necessary materials, equipment, and labor for the work to be completed. The contractor assumes the risk of price increases to any labor, equipment, or materials needed for the work. OCTA shall only pay the awarded bid price for the project.
Final Planning
Municipal
$102,000.00
Public - County
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 27, 2025
February 28, 2026
California 91 Express Lanes, Corona, CA
Related To This Project
Corona, CA
Bid Date: Sep 11 2025
Corona, CA
Bid Date: Sep 12 2025
Corona, CA
Bid Date: Sep 15 2025
Corona, CA
Bid Date: Sep 08 2025
Corona, CA
Bid Date: Oct 17 2025
Corona, CA
Bid Date: Oct 06 2025
Corona, CA
Bid Date: Oct 09 2025
Corona, CA
Bid Date: Sep 25 2025
Corona, CA
Bid Date: Aug 26 2025
Corona, CA
Bid Date: Aug 25 2025
Corona, CA
--
Corona, CA
Bid Date: Aug 21 2025
Corona, CA
Bid Date: Oct 28 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
